书签 分享 收藏 举报 版权申诉 / 5

类型外文翻译-树脂环对充分包裹锚杆锚固性能的影响.pdf

  • 文档编号:22081
  • 上传时间:2024-03-25
  • 格式:PDF
  • 页数:5
  • 大小:1.13MB
  • 配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    外文 翻译 树脂 充分 包裹 锚固 性能 影响
    资源描述:

    1、The effect of resin annulus on anchorage performance of fully encapsulated rockbolts PCHaganTheUniversityofNewSouthWales(UNSW),SydneyA diverse selection of rockbolt designs and resin anchors are available for use inundergroundmines.ResearchinrecentyearsattheUNSWMiningResearchCentreledtotheconstructi

    2、onofarockboltpulltestingfacility.Thisfacilityhassubsequentlybeenupgraded,commissionedandinitialtestworkhasbeencompletedtoverifythepulltestprocess.Atestprogramhasbeencompletedwiththeobjectivetounderstandtheloadtransfermechanismandimprovethegeneralperformanceofrockbolts.Thispaperdescribestheresultsoft

    3、hisresearch.INTRODUCTION Rockbolts are increasingly relied on as a keycomponent in the primary support mechanism ofmany underground mines.In the Australian coalminingindustry,forexample,over5millionrockboltsareinstalledeachyearatacostofover$A35million.PreviousresearchbyUNSW,StrataControlTechnology P

    4、ty Ltd(SCT)and Powercoal Ltd hasfoundthatover30%ofrockboltsarenotprovidingoptimumperformanceincoalminingenvironments(Galvinetal2001).Aresearchinitiativehasbeenlaunchedcombiningtheskills and experience of industry and researchexpertiseintheuniversitytodevelopanunderstanding of fully encapsulated rock

    5、bolts.Thebroadobjectivebeingtoimprovetheperformanceofrockboltsystemsandhenceimproveoverallsafetyinmines.Thisinitiativeresultedintheestablishmentofa test facility at UNSW that operates within acontrolledlaboratoryenvironment.As part of this initiative,the research aimed toquantifythesensitivitytochan

    6、gesinvariousrockboltparameters on anchorage performance.This paperoutlinestheresultsfoundtodatewithregardtothethickness of the resin annulus on anchorageperformanceoffullyencapsulatedrockbolts.TEST FACILITY Design objectives Thedesirableattributesofarockbolttestfacilitywereseenas:thefacilityshouldbe

    7、capableofexaminingawiderangeofparametersassociatedwiththeinstallationofrockboltsandofreplicatingawiderangeofconditions;tests should be carried out under controlledconditions to better ensure the repeatability ofresults;thefacilityshouldbeavailableforusebyindustry(bothsuppliersofrockboltsystemsandind

    8、ustryendusers)for such purposes as independentlyassessing the performance of new products orchangesinthemethodofinstallation.The design of the new test facility incorporates ahydraulicramsimilartothatusedinmostrockboltpullout tests.The ram can apply various loadconditionstoarockbolt.Abiaxialcellisus

    9、edtoholdthe test specimen containing a fully encapsulatedrockbolt.Thetestspecimenmayeitherbeasampleofrockreplicatingtheconditionsinaparticularmineor,amanmadematerial.Theadvantageofthelatterisitmitigatesmanyoftheproblemsthatcanariseduetothe variability in material properties between rocksamples.Theef

    10、fectofresinannulusthicknessonanchorageperformanceoffullyencapsulatedrockboltsPCHagan,UNSWMiningResearchCentre2Facility features ThetestfacilityattheUNSWMiningResearchCentreusesamodifiedworkshoplatheasthetestplatform.Themaincomponentsofthefacilityinclude:abiaxialcellwithaninternaldiameterof145mm,leng

    11、thof200mmandratedmaximumconfinement pressure of 30MPa mounted to thebedofthelathe;servocontrol hydraulic system used for precisecontrol of the loading rate of a 300kN capacityhollowcoreramduringapullouttest;computerised system to control the applied loadthrough the hydraulic system and monitor theac

    12、tualloadanddisplacementoftherockbolt.TEST SAMPLE PREPARATION Test samples Acementitousgrout(CeltiteMG75S)wasselectedinplaceofcoredrocksamplesinthetestprogram.Thestrengthofgroutwasapproximately75MPa.In order to ensure uniform material properties,asingle batch of over 100 test samples was preparedandc

    13、astinplasticmoulds.Eachcorehadadiameterof145mmandlengthof200mm.Thesampleswerecuredforatleast28daysbeforetesting.A hole was drilled in each sample to a depth of175mmusingadrillrodmountedonthelathe.Achiselbitwasusedforthe26mmholeandfingerbitswere used for the larger holes.A constant rotationspeedandfe

    14、edratewasusedwithwaterflushingtoensureuniformroughnessoftheborehole.Rockbolt anchorage ACeltite24mmextrahighstrengthCXrockboltwasusedinthetestprogramwithabasicprofiledesignasshown in Figure 1.The rockbolt has an inner corediameter of 21.7mm,a diameter across the ribs of22.8mmandribspacingof10mm.Ther

    15、ockbolthasanultimatetensilestrengthof344kN.Figure 1.Profile of the rockbolt used in the test program.Resin cartridges were initially used for anchoring,however,problems with poor mixing between theresinandcatalystandwiththeplasticpackagingledto inconsistent results.The poor mixing wasexacerbatedbyth

    16、eshortlengthofencapsulation.Amixandpourresinwassubsequentlyusedinthetestprogram.Aftermixing,theresinwasinjectedintothe hole into which the spinning rockbolt wasrammed.The rockbolt was supported in the chuckwhile the resin was allowed to set for 10min.Theresinwasthenlefttocureforafurther48hwiththerockboltandsamplestandingvertically.Itwasobservedthatwiththechangefromacartridgeresintoamixandpourresintherewasaneartwofold increase in the maximum pullout load toapproximately200250kN.EXPERIMENTAL PROGR

    展开阅读全文
    提示  图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:外文翻译-树脂环对充分包裹锚杆锚固性能的影响.pdf
    链接地址:https://www.thwenku.com/cad/22081.html
    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    网站客服QQ:2356858848

      客服联系电话:18503783681

    copyright@ 2008-2022 thwenku.com网站版权所有

    ICP备案:豫ICP备2022023751号-1