临西1.8Mta矿区型选煤厂方案设计及主厂房工艺布置.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 临西 1.8 Mta 矿区 选煤 厂方 设计 厂房 工艺 布置
- 资源描述:
-
1、摘 要本设计为1.8Mt/a 的矿区型选煤厂,地处山西临汾市。该厂的工作制度为每年工作330天,每天16个小时,施行两班生产,一班检修的轮换制度。本厂入洗原煤来自西沟坑口和东胜坑口,两者的配比为6:4。主要产品为精煤、中煤和煤泥。其中,精煤要求灰分为7.518.00%,水分Mt11.00%。经过原料煤资料分析、可选性判断以及通过技术经济比较后,本选煤厂流程定为三产品重介旋流器浮选联合流程。原煤经筛分破碎的准备作业后,由无压三产品重介旋流器进行分选,煤泥浮选,尾煤压滤,并且达到洗水闭路循环。精煤、中煤用铁路运出,煤泥和矸石用汽车外运,在当地销售。该厂主要建筑有准备车间、主厂房、压滤车间、产品仓等
2、。其中,主厂房东西5跨,南北3跨。由于该厂为大型厂,所选设备处理量较大,其中三产品旋流器一段直径为1400mm,二段直径为1000mm,精煤脱介筛型号为ZKS3675,中煤为ZKS3060,精煤磁选机型号为2CTXN1230,中煤为2CTXN1030,离心机型号为WZL-1200,浮选机采用的是XJM-S12型。本厂总投资1.16亿元,吨煤投资64.46元,投资回收期半年,全员效率为49.59吨/工。除工艺流程外,本设计还对选煤厂的建筑结构、供电和电气、机修车间、铁路运输、劳动定员、生产成本及建厂初步投资概算做了系统的设计。设计时吸收了国内先进经验,全厂生产作业实现了集中控制、机械化和自动化。
3、关键词:设计; 重介质选煤; 浮选ABSTRACTThis is a coal processing plant design for the mining area type and its designed productivity capacity is 1.8Mt/a.Its located in linfen of shanxi Province.There are 330 workdays per year and 16 hours per workday in this plant which runs in shifts,two shifts are in charge of
4、producing and another is in charge of checking and repairing equipments.The raw coal comes form xigou pithed and dongsheng pithed,and between which the proportion is 60 percents to 40 persents.The main products are:clean coal,middling and tailings.Among them the clean coal require Ad is between 7.51
5、 persent and 8.00 persent,Mt11.00% at the same time.After analyzing the date of coal samples,estimating of the quality and comparation of economics and technique,the flowsheet of the plant is designed as three-product heavy medium-flotation united.All of the raw coal is separated in three-product-de
6、nse-medium cyclones after the preparation process,and then the fine coal is concentrated by flotation.The tailings from flotation are treated by pressure filtration so that fine coal can be recovered and washing water is recycled inside the plant.Among the products of the plant,the fine coal and mid
7、dle coal are carried by train.The gangue and the slime are carried by car,selling in the region.The main buildings of this plant include the prepare plant,the main plant,the pressure plant,and the produce camalig.In this plants,the main plant have 5 units in the east and west direction,and 3 units i
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


风湿治疗仪盒上盖注射工艺分析及模具设计-开题报告.doc

