1、兴隆煤矿矿井2,3号煤层初步设计摘 要本次是兴隆煤矿矿井2,3号煤层初步设计,设计图纸共七张,说明书共十章。根据采矿工程的需要和特点,设计重点为第四、六、九章,其他章节做一般的选型计算。 本井田位于陕西省韩城市北24km的马庄村西南,行政区划隶属韩城市龙门镇及盘龙乡管辖。本井田内有多层煤,本次设计为2,3号煤层,平均厚度均为3.50m。煤层有煤尘爆炸性,煤层无自燃倾向。矿井属于突出矿井,2号煤层瓦斯相对涌出量为6.04m3/t,3号煤层瓦斯相对涌出量为8.32m3/t。本矿井采用双斜井单水平开拓,采煤工艺为走向长壁综合机械化采煤,作业制度采用“四六制”。工作面的设备有双滚筒采煤机、液压支架、可
2、弯曲刮板运输机、破碎机、转载机等。采空区采用全部垮落法处理顶板。本矿井设计年产量为1.2Mt/a,采用一套综采设备来满足产量的要求。 矿井运输大巷采用胶带运输作为主运输,采用无极绳连续牵引车作为主要辅助运输,矿井通风采用轴流式扇风机,抽出式通风方式。关键词:开拓;采区;工艺;通风;保护层。1Abstract This paper mainly designs coal mining of XingLong colliery, No. 2 and 3 coal bed. There are seven design drawings altogether, and ten chapters in
3、 the instruction book. In accordance with requirements and features of mining engineering, we focus on the fourth, sixth and ninth chapters. As for other parts like shaft station, underground transportation and hoisting equipment, this paper only makes general selection calculations. The colliery, a
4、n administrative division of Mazhuang county, Longmen town jurisdiction, and 24 kilometers from Hancheng County Seat, lies in the westsouth area of Mazhuang, Hancheng county, Shanxi province, . Coal Mine within the multilayer, but only consider the design of 2,3 seam, average thickness are 3.50m. Th
5、ere are explosive coal dust, no spontaneous combustion tendency of coal. Mine belongs outburst, No. 2 coal seam gas emission relative amount of 6.04m3 / t, 3 coal seam gas emission relative amount of 8.32m3 / t.We divide this well field into belts, and adopt double vertical shaft method., coal minin
6、g method for the introduction of a full-thickness, using the4/6 system as the operation system. The work faces haue a dual-face shearer, hydraulic support, flexible scraper conveyors, crushers, loader and so on. The all-fall-down method is applied in roof processing of the worked out section.The des
7、igned annual output of the mine 1.2Mt / a, using a set of mining equipment required to meet production.Mine haulage roadway using tape transport as the main transport, using endless rope continuous tractor as the main auxiliary transport. As for mine ventilation, we use axial-flow type diagonal fan