平顶山十矿3.0Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 平顶山 3.0 Mta 设计
- 资源描述:
-
1、 摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为平顶山十矿3.0Mt/a新井设计。平顶山十矿位于平顶山市东北部约6km,交通便利。井田走向(东西)长约8.46km,倾向(南北)长约3.32km,总面积为24.42km2。主采煤层为5煤,煤层倾角为2.35.2,平均总厚度为10.9m。井田地质条件较为简单。井田工业储量为473.37Mt,可采储量为332.68Mt。矿井设计生产能力为3.0Mt/a。矿井服务年限为78.89a,涌水量不大,矿井正常涌水量为70m3/h,最大涌水量为138m3/h。矿井瓦斯相对涌出量为9.29 m3/t,绝对涌出量为10m3/min,为低瓦斯矿井
2、。井田开拓方式为立井单水平上下山开拓。采用胶带输送机运煤,采用矿车进行辅助运输。矿井通风方式为中央并列式通风。矿井年工作日为330d,工作制度为“三八”制。一般部分共包括10章:1、矿区概述与地质特征;2、井田境界和储量;3、矿井工作制度、设计生产能力及服务年限;4、井田开拓;5、准备方式带区巷道布置;6、采煤方法; 7、井下运输;8、矿井提升;9、矿井通风与安全;10、设计矿井基本技术经济指标。专题部分题目是煤矿煤与瓦斯突出的防治措施,主要是研究了煤与瓦斯突出的特点,以及煤与瓦斯的防治措施。翻译部分主要内容是关于长臂工作面顶板支护的研究,英文题目为: A method for the des
3、ign of longwall gateroad roof support。关键词:立井;单水平;带区;中央并列式通风ABSTRACTThis design includes three parts: the general part, the special subject part and the translation part. The general part is a new design for pingdingshanshikuang mine. pingdingshanshikuang mine is located in pingdingshan the distance
4、form the locate about 6km. It is very convenient to get to the mine in terms of both highway and railway. The length of the coalfield is 8.42km,the width is about 3.32km,and the total area is 24.42km2.The fifth is the main coal seams, and its dip angle is 2.35.2 degree. The thickness of the mine is
5、about 10.9m in all. The geologic structure of this coalfield is simple.The recoverable reserves of the coalfield are 473.37 million tons,and the minable reserves are 332.68 million tons. The designed productive capacity is 3.0 million tons percent year, and the service life of the mine is 78.89 year
6、s. The normal flow of the mine is 70m3 per hour and the max flow of the mine is 138 m3 per hour. The relative mine gas gush is 1.31 m3/t and the absolute gush is 10 m3/min, so it is a low gas mine. The mine is a single level in two shafts to develop. Te central laneway uses Belt Conveyor to transit
7、coal, and trolley wagons are used for accessorial transportation in the roadway.The ventilation mode of this mine is center juxtapose form.The “three-eight” working system is used in the Zhaizhen mine. It produces for 330 days a year. This design includes ten chapters: 1.An outline of the mine field