海棠湾大酒店供配电系统设计-外文翻译.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 海棠 大酒店 配电 系统 设计 外文 翻译
- 资源描述:
-
1、外文文献Abstract This paper analyzes Chinas current power supply and distribution of tall buildings in several fire design, combined with specification and engineering examples for the distribution of the current high-rise building design to explore the problems and propose appropriate solutions.Key wor
2、dshigh-rise building fire Supply Emergency Power Supply Power SupplyAs Chinas national economic development, building more and more land, more and more precious land resources, prompting the development of various types of construction to the high-level, so high-rise building fire safety is increasi
3、ngly a cause-oriented. For the characteristics of high-rise building fires, high-rise building fire safety design should be based on self-defense self-help, while the fire service for the distribution is to ensure the normal operation of the key fire-fighting facilities, directly related to high-ris
4、e building fire safety. Therefore, this article from the fire power configuration, fire distribution, fire electrical wiring for high-rise building power supply and distribution reliability analysis, propose appropriate solutions to ensure high-rise building fire safety standards. 1. High-rise build
5、ing fire power scheme 1.1 specification power supply requirements for fireAccording to fire protection design of tall buildings (hereinafter referred to as high regulation) provides high-rise building fire power should be the current national standard for power distribution system design specificati
6、ons, the requirements of the design, a class of construction by a load of required power supply, second-class high-rise buildings should be two power load requirements. According to civil electrical specifications (JGJ/T16-92) provides a load consists of two power supply, when a power failure, the o
7、ther at the same time the power outage Buzhi Yu; a load is especially important in load, in addition to the above-mentioned two power supplies, the Must also be an additional emergency power supply of the third power; 2 load power should make sure that when the power transformer failure or circuit c
8、ommon failure, without interruption of power supply (or the rapid recovery after the interruption), the load is relatively small or regional power supply The difficult conditions, the two loads can be more than a return to 6KV dedicated overhead power lines or cables. 1.2 The composition of high-ris
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


康平家园小区供配电及照明电气设计【含CAD图纸+文档】.zip
草垛沟5号煤层1.5Mta开采设计.doc

