成庄煤矿300万吨新井设计.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 煤矿 300 万吨新井 设计
- 资源描述:
-
1、摘 要本设计矿井的井田面积为29.96平方千米,年产量300万吨。井田内煤层赋存比较稳定,煤层倾角,平均3,煤层厚度平均8.0m。井田范围内整体地质条件比较简单,断层较发育,但均是小断层。矿井瓦斯含量较高,为高瓦斯矿井,矿井涌水量不大。根据实际的地质资料情况进行井田开拓和准备方式的初步设计,该矿井决定采用双斜井两水平上下山开采,采用带区式开拓方式。设计采用综合机械化放顶煤回采工艺,倾斜长壁采煤法,用全部跨落法处理采空区,并对矿井运输、提升、排水和通风等各个生产系统的设备选型计算,以及对矿井安全技术措施和环境保护提出要求,完成了整个矿井的初步设计。矿井全部实现机械化,采用先进技术和借鉴已实现高产
2、高效现代化矿井的经验,实现一矿一面高产高效矿井从而达到良好的经济效益和社会效益。关键词:倾斜长壁 放顶煤 综合机械化 高产高效AbstractThese designed allotment area for 29.96 square kilometers,Yearly Output three-hundred trillion. Allotment intrinsically ocurrence of coal seam compare stabilize,coal seam pitch is under fifteen acid,average coal seam pitch is thr
3、ee acid.Coal seam thick is 8.0m,integrally nature condition compare simplicity,at allotment scope east normalizing function of the stomach and pleen center equal have got dislocation upgrowth. Both methane and carbon dioxide content relatively do not high, and neither do inflow of water no large eit
4、her. On the basis of Preliminary Design,said shaft opt in adopt three vertical shaft fluctuate mountain exploitation,coal seam grouping band region fluctuate mountain co- disposal mode of opening,design adopt comprehensive mechanization full-seam mining stopper art,incline longwall method,treat goaf
5、 with whole straddle alight law from actual geologic information instance proceed allotment exploit and stand-by mode. The Preliminary Design of the both both combine versus mine haul, shaft exaltation, shaft drain and ventilation of mines isopuant systemic equipment lectotype count,as well as versu
6、s shaft technical safety measures and environmental protection claim,complete wholly shaft. Both shaft whole realize mechanization,adopt advanced techniques and use for reference afterwards realize high yield highly active modernization shaft experience,realize one mine not both high yield highly ac
7、tive shaft thereby run up to favorable economic benefit and social benefit. Keyword:incline length wall full-seam mining comprehensive mechanization high yield highly active 1181目 录前 言11 矿井概况及井田地质特征21.1 井田位置和交通条件21.2 自然地理31.3井田地质特征及煤性分析42 矿井储量、年产量及服务年限102.1 井田境界102.2 井田储量102.3 矿井年产量及服务年限163 矿井开拓183.
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


高效纤维束过滤器加工图.dwg
山楂去核机的设计【含CAD图纸、SolidWorks三维模型及说明书】.zip

