超化煤矿1.2Mta新井设计.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 煤矿 1.2 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为超化煤矿1.2Mt/a新井设计。超化煤矿位于河南省郑州市管辖的新密市境内,交通便利。井田走向(东西)长约3.6km,倾向(南北)长约2.6km,总面积为9.36km2。主采煤层为二1煤,煤层倾角为721,平均总厚度为9.0m。井田地质条件较为简单。井田工业储量为12108万t,可采储量为8402万t。矿井设计生产能力为1.2Mt/a。矿井服务年限为53.8a,涌水量不大,矿井正常涌水量为500m3/h,最大涌水量为650m3/h。矿井瓦斯相对涌出量为3.84 m3/t,绝对涌出量为11.2m3/min,为低瓦斯矿井。井田开拓方式
2、为立井两水平开拓,暗斜井延深。采用胶带输送机运煤,采用矿车进行辅助运输。矿井通风方式为中央并列式通风。矿井年工作日为330d,工作制度为“三八”制。一般部分共包括10章:1、矿区概述与地质特征;2、井田境界和储量;3、矿井工作制度、设计生产能力及服务年限;4、井田开拓;5、准备方式带区巷道布置;6、采煤方法; 7、井下运输;8、矿井提升;9、矿井通风与安全;10、设计矿井基本技术经济指标。专题部分题目是综放工作面高产高效影响因素分析,主要是研究影响综放工作面的各种因素,并结合实例分析。翻译部分主要内容是关于爆破在煤巷掘进中的应用,英文题目为: APPLICATION OF BLASTING I
3、N DRIVING TUNNEL。关键词:立井;暗斜井;两水平;带区;中央并列式通风;放顶煤采煤法;ABSTRACTThis design includes three parts: the general part, the special subject part and the translation part. The general part is a new design for Chaohua coal mine. Chaohua coal mine is located in Xinmi which comes within the jurisdiction of Zhengz
4、hou in Henan province. It is very convenient to get to the mine in terms of both highway and railway. The length of the coalfield is 3.6km,the width is about 2.6km,and the total area is 9.36km2.The second is the main coal seam, and its dip angle is 721 degree. The thickness of the mine is about 9.0m
5、 in all. The geologic structure of this coalfield is simple.The recoverable reserves of the coalfield are 121.08 million tons, and the minable reserves are 84.02million tons. The designed productive capacity is 1.2 million tons percent year, and the service life of the mine is 53.8 years. The normal
6、 flow of the mine is 500m3 per hour and the max flow of the mine is 650 m3 per hour. The relative mine gas gush is 3.84m3/t and the absolute gush is 11.2 m3/min, so it is a low gas mine. The mine is vertical shaft development with two mining levels and the extension of vertical shaft. The central la
7、neway uses Belt Conveyor to transit coal, and trolley wagons are used for accessorial transportation in the roadway.The ventilation mode of this mine is center juxtapose form.The “three-eight” working system is used in the Chaohua mine. It produces for 330 days a year. This design includes ten chapt
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


NGW92行星减速机全套CAD图纸.zip

