国投哈密一矿8.0Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 哈密 8.0 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为国投哈密一矿8.0Mt/a新井设计。全篇共分为十个部分:1.矿井概况及井田地质特征;2.井田境界和储量;3.矿井生产能力、服务年限及工作制度;4.井田开拓;5.准备方式带区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全技术;10.矿井基本技术经济指标。国投哈密一矿位于哈密市190方向40km处,其行政区划属哈密市南湖乡管辖,南湖乡所在地位于井田北侧约19km处。井田南北宽6.75km,东西长约7.7km,面积约51.98km2。井田内可采煤层为3#,7#煤,其赋存稳定,厚度平均2.85m,10.41m,倾
2、角平均8.0,为近水平缓倾斜煤层。井田内工业储量为 947.92 (M t),可采储量为775.3 (Mt)。矿井平均涌水量为124 m3/h,相对瓦斯涌出量为0.019m3/t,属低瓦斯矿井;煤尘具有爆炸性危险,有自燃发火倾向。国投一矿设计生产能力为8.0Mt/a,服务年限为74.55年,工作制度为“三八”制。矿井采用斜井两水平直接延伸开拓方式,采用倾斜长壁综合机械化放顶煤采煤法。矿井采用一矿一面的高效作业方式,工作面长度为250m。水平运输大巷采用胶带输送机运输,辅助运输采用架线式电机车牵引1.5t固定箱式矿车运输矸石和材料等。矿井通风方式为中央并列式。专题部分:专题题目为“提高综放工作面
3、采出率的理论与技术研究”。翻译部分:是将关于一篇煤炭特殊开采的英文翻译成中文。英文题目是“Coal Mining Under Special Conditions”。 关键词:斜井开拓;二水平斜井直接延伸;带区布置;放顶煤ABSTRACTThis design contains three parts: the general,the special subject and the translation.The general part is a new design of Ha Mi a Mine 1.2 million t / a in China Investment Company.
4、 The whole article is divided into ten parts: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The designed productive capacity, service life and working system of mine; 4.development engineering of coalfield; 5.The layout of panels; 6. The explorer method used in coal
5、mining; 7. Transportation of the underground; 8.The lifting of the mine; 9. The ventilation and the safety operation of the mine; 10.The basic economic and technical norms.The Ha Mi a Mine field is located in HaMi city 190 direction 40 km place, its administrative districts of HaMi city jurisdiction
6、 of the south lake township, village in the north to the south lake located in laohutai mine field about 19 km place.The boundary of the mine field runs 6.75 km from north to south and 7.7 km from west to east. The total plane area of the mine is about 51.98 km2. In the well field may mine coal is t
7、he3#, 7# coal. Its average thickness of the seam is 2.85 m , 10.41 m and it is stable and flatly inclined. Its dip angle is 8.0 degree on average. The industry reserves of the mine field are 947.92 million tons and the useable reserves are 775.3 million tons. The average inflow rate in Ha Mi a mine
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


釜山五矿2.40Mta新井设计(CAD图纸+说明书).zip