1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分针对张小楼矿井进行了井型为1.5Mt/a的新井设计。张小楼矿位于徐州市西北铜山县柳新镇和刘集镇境内。整个井田东西长约4.80km、南北宽约3.53km,井田面积16.54km2。开采深度为-280m-1250m。主采煤层为7煤和9煤,7煤煤厚6m,9煤煤厚3m,两煤层相距10m左右,为近距离煤层,煤层倾角变化较大,浅部平均20,深部平均5。矿井正常涌水量为76m3/h,最大涌水量为160m3/h;矿井相对瓦斯涌出量为3.35m3/t,属低瓦斯矿井。井田工业储量为205.39Mt,可采储量137Mt,矿井设计井型为1.5Mt/a,矿
2、井服务年限为65.24a。根据井田地质条件,设计采用立井两水平开拓方式,都为上下山准备方式,一水平位于-600m,上山垂高320m,下山垂高250m,二水平位于-1150m,上山垂高300m,下山垂高100m,。井田共分为7个采区和2个带区,轨道大巷和胶带机大巷岩石大巷,布置在9煤层底板岩层中。考虑到本矿井为低瓦斯矿井,矿井通风方式采用中央并列式通风。大巷采用胶带输送机运煤,辅助运输采用架线式电机车牵引固定箱式矿车。主井采用箕斗提煤,副井采用罐笼运料和升降人员。针对东一采区采用了采区联合准备方式,共划分3个区段,并进行了运煤、通风、运料、排矸、供电系统设计。针对7101工作面进行了采煤工艺设计
3、。该工作面煤层平均厚度为6.0m,平均倾角20,直接顶为泥岩,老顶为细砂岩。工作面采用长壁综采放顶煤采煤法。采用双滚筒采煤机割煤,往返一次割两刀。采用“四六制”工作制度,截深0.6m,每天六个循环,循环进尺3.6m,月推进度108m。专题部分题目为张小楼矿微震规律与冲击矿压关系研究,以张小楼矿95206工作面为背景,进行了详实的微震观测数据收集与处理,分析得到张小楼矿微震分布规律与冲击矿压关系,为张小楼矿进行防止冲击矿压提供了有力的技术支持。翻译部分题目为Mine gas drainage and outburst control in Australian underground coal
4、mines,主要介绍了澳大利亚预防煤与瓦斯突出技术。关键词:张小楼矿;立井两水平开拓;采区布置;综采放顶煤;中央并列式通风;微震检测;冲击矿压ABSTRACTThis design includes three parts: the general part, special subject part and translation part.The general design is about a 1.50 Mt/a new underground mine design of zhang xiao lou coal mine. Zhang xiao lou coal mine is lo
5、cated in xuzhou, Jiangsu province. Its about 4.8 km on the strike and 3.53km on the dip, with the 16.54 km2 total horizontal area. The minable coal seam is 7# and 9# with an average thickness of 6.0 m and 3m .The Two layers of coal are 10 m apart.They are very close. The Two layers of coal has a lar
6、ger change dip , shallow average of 20 , deep average of 5. The normal mine inflow is 76 m3/h and the maximum mine inflow is 160 m3/h. The mine gas emission rate is 3.35 m3/t which can be recognized as low gaseous mine. The proved reserves of this coal mine are 205.39 Mt and the minable reserves are
7、 137 Mt, with a mine life of 65.24 a.Based on the geological condition of the mine, this design uses a duel-vertical shaft two-level development method, and full strip preparation ,which divided into seven districts and two strips, The first level is located -600 m ,and rise horizon interval is 320