城郊矿240万吨新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 城郊 240 万吨新井 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为城郊矿240万吨新井设计。主采煤层为二2号煤、三2号煤,平均倾角为3,煤层平均总厚为8.91m。井田地质条件较为简单。井田工业储量为166.6Mt,矿井可采储量111.19Mt。矿井服务年限为64.86a,涌水量不大,矿井正常涌水量为200m3/h,最大涌水量为360m3/h。井田中各煤层瓦斯含量一般小于0.5cm3/g,属低瓦斯矿井。各煤层均无煤尘爆炸危险。各煤层均属不自燃发火煤层。井田为立井单水平开拓。大巷采用胶带运输机运煤,辅助运输采用矿车运输。矿井通风方式为混合式通风,前期中央风井回风,后期带区风井回风。矿井年工作日为3
2、30d,工作制度为“四六”制。一般部分共包括10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度及设计生产能力、服务年限;4.井田开拓;5.准备方式带区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全技术;10.矿井基本技术经济指标。专题部分题目是浅谈煤矿冲击矿压及防治措施翻译部分主要内容为关于应力波穿越节理时的透反射系数的研究,英文题目为:Study on the transmission and reflection of stress waves across joints.关键词:城郊煤矿; 双立井; 单水平; 采区与带区布置; 综采放顶煤方法
3、; ABSTRACTThis design includes of three parts: the general part, special subject part and translated part. The designed productive capacity is 2.4 million tons percent year. The two and three is the main coal seam, and its dip angle is 3 degree. The thickness of the mine is about 8.91m in all. The m
4、ine Geology quality condition is simple by Comparison.The proved reserves of the minefield are 166.6 million tons. The recoverable reserves are 111.19 million tons. And the service life of the mine is 64.86 years. The normal flow of the mine is 200m3 percent hour and the max flow of the mine is 360
5、m3 percent hour. The mineral well gas gushes less than 0.5cm3/g, for low gas mineral well. All the coal seam does not have the danger of explorer, or burn by itself.The mine farmland is a single level in an inclined well to expand. The mine farmland signs the single level of well to expand for the d
6、ouble. The mine lane adopts the tape conveyance luck coal, assistance conveyance adoption mineral car. The well ventilated way of the mineral well is well ventilated for admixture type, expecting the central breeze well to return to breeze before, expecting to take the area breeze well to return to
7、breeze later. The working system “four-six” is used in the Chengjiao mine. It produced 330d/a.This design includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.development engineering of coalfield; 5.The l