外文翻译-沿空掘巷老顶的稳定性分析.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 沿空掘巷老顶 稳定性 分析
- 资源描述:
-
1、英文原文Stability analysis for main roof of roadway driving along next goafBAI Jian-biao(School of Energy Science and Engineering, China University of Mining & Technology, Xuzhou, China)Abstract: Focusing on the stability of surrounding rock around the roadway driving along next goaf with a narrow coal
2、pillar, a mechanics model of the triangle block structure of main roof above the roadway is established, and the sliding stability coefficient K1 and the rotation stability coefficient K2 are proposed to describe the stability of the triangle block structure quantitatively. The structure can keep a
3、self stability before and after the roadway excavation, at the stage of mining-induced effect, the stability of the structure is lowered, and the structure may become instability with decreasing the coal strength, increasing the mining height of working face and the mining depth.Keywords: roadway dr
4、iving along next goaf; triangle block structure; stability analysisWith face advancing, the main roof results in periodic breaking, and the rock blocks after breaking are along the face strike direction formed into a voussoir beam structure. The breaking form in the face end is an arctriangle block
5、1 as shown in Fig. 1.In general, the roadway driving along next goaf can not affect the stability of arc triangle block structure in the upper working face, and affected by advance abutment pressure of the face mining, the stability of arc triangle block structure and the moving state must take plac
6、e in greater change2, 3, and the field practice also indicated that the deformation of roadway driving along next goaf is smaller at the stage of the excavating influence and at the stable stage after excavation, but after the mining induced effect of the working face, the surrounding rock activity
7、of roadway is violent and itsdeformation is also greater4.Fig. 1 The triangle block structure of roadway driving along next goaf1 Mechanics model of triangle block structure of main roof 21. 1 Establishment of mechanics model of triangle block structureAccording to Fig. 1, the arc triangle block str
8、ucture is simplified as follows:(1)The triangle block B, rock mass A on the solid coal side and the block body on the side of goaf C form an articulated structure, because the periodic weighting advance of a working face is basically equal, i. e. the breaking characteristics of main roof is basicall
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

