书签 分享 收藏 举报 版权申诉 / 25

类型外文翻译-煤矿井下的业务建模与分析.doc

  • 文档编号:21133
  • 上传时间:2024-03-24
  • 格式:DOC
  • 页数:25
  • 大小:672.01KB
  • 配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    外文 翻译 煤矿 井下 业务 建模 分析
    资源描述:

    1、翻译部分英文原文OPERATIONS MODELING AND ANALYSIS OF AN UNDERGROUND COAL MINE Kanna Miwa Soemon Takakuwa Nagoya Gakuin University Faculty of Commerce 1-25 Atsutanishimachi, Atsuta-ku, Nagoya, Aichi, 456-8612, JAPAN. Nagoya University Graduate School of Economics and Business Ad- ministration, Furo-cho, Chiku

    2、sa-ku, Nagoya, Aichi, 464-8601, JAPAN ABSTRACT In general, it is quite difficult to describe and model operations and conveyance systems precisely in un- derground coal mines because of geological components, poor visibility, unreliable installed facilities, and difficult work conditions. In this st

    3、udy, a simulation model of an operations and materials handling system for an underground coal mine was built to investigate the relationship between the coal output and materials handling systems, which includes specifications for the facilities and the buffer space for the storage bin underground.

    4、 It was found that it is possible to find the bottleneck of a conveyance system to determine more efficient mining and conveyance methods by performing a simulation. 1 INTRODUCTION Underground mining is a dangerous industry because of geological disasters, poor visibility, workplace hazards, and dif

    5、ficult work conditions .The mining industry is aware of the need to improve productivity continually. This improvement can be achieved by introducing improved and more efficient mining methods, optimizing production for a given set of resources, and improving mine design and equipment selection. Sit

    6、e mining engineers face decisions in design, planning, production, development, and operations, and the full implications of each choice are neither clear nor quantified. The benefits to a mine with a formal decision support model are significant (Hoare and Willis 1992). The problems facing the indu

    7、stry are growing in both size and complexity. Production is time dependent, and work practices not only reduce production but also enforce inefficient use of expensive capital equipment. Simulation can be used to aid management in making decisions related to daily production and capital expenditure.

    8、 Underground mines often face uncertainty in production planning associated with diverse sources such as grade distribution, ground conditions, equipment reliability, infrastructure needs and extraction method performance. Despite their best planning efforts, such operating uncertainty needs to be c

    9、ounter-balanced by integrating a contingency plan to enhance flexibility in mine plants (Kazakidis and Scoble 2003). The development, demonstration and implementation of a virtual reality simulation have been described for coal mining industries (Stothard, Galvin, and Fowler 2004). From the standpoi

    10、nt of occupational health and safety management, virtual reality simulations were developed to provide more effective education, training and assessment. Virtual reality simulations enable trainees to experience a range of real situations that they may otherwise not encounter prior to a critical eve

    11、nt (Zhao, Lucas, and Thabet 2009; Zhou and Guo 2011). Modeling and simulation of particle size distribution and exploratory tools for real mining equipment operator activities have been studied (Harper and Harper 1998; Larinkari, Kaartinen, and Miettunen 2004). System dynamics models have been intro

    12、duced to build a model of underground coal mines (Coyle 1985). Regarding open pit mining, LP-based disaggregation approaches to solve production scheduling problem have been proposed (Boland et al. 2009). In addition, the use of operation process simulation for Six Sigma Projects has been introduced

    13、 to illustrate the process to define, measure, analyze and improve the current process (Chinbat and Takakuwa 2008). In this study, a simulation model was constructed and used to examine the performance of an underground coal mine. The conveyance system from the longwall mining site to ground facilit

    14、ies comprises scraper chain conveyors, a storage bin, and the main-shaft skips. The relationship between mining speed and the velocity of the main-shaft skips was examined in conjunction with the inventory of the coal storage bin underground. 2 UNDERGROUND COAL MINING AND OPERATIONS Technological ad

    15、vancements have made coal mining more productive than it has ever been. To keep up with technology and to extract coal as efficiently as possible, modern mining personnel must be highly skilled and well-trained in the use of complex, state-of-the-art instruments and equipment. Coal is mined by two m

    16、ethods: surface, or open pit, mining and underground, or deep, mining. There are two main methods of underground mining: room-and-pillar and longwall mining. Self-advancing, hydraulically- powered supports temporarily hold up the roof while coal is extracted (Japan Coal Energy Center 2010). In this study, underground coal mining with the longwall shearer is examined. An overview of the coal mine is shown in Figure 1. The longwall shear

    展开阅读全文
    提示  图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:外文翻译-煤矿井下的业务建模与分析.doc
    链接地址:https://www.thwenku.com/cad/21133.html
    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    网站客服QQ:2356858848

      客服联系电话:18503783681

    copyright@ 2008-2022 thwenku.com网站版权所有

    ICP备案:豫ICP备2022023751号-1