外文翻译 - 智能建筑发展.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文翻译 智能建筑发展 外文 翻译 智能建筑 发展
- 资源描述:
-
1、外文文献及译文 文献、资料题目:Developing an Intelligent Building 文献、资料来源:CLEAR Communications文献、资料发表(出版)日期:院 (部): 专 业: 班 级: 姓 名: 学 号: 指导教师: 翻译日期: 外文文献: Developing an Intelligent Building Jonathan Jepson, CLEAR Communications Presented at Ideaction 2000Introduction This paper describes how CLEAR Communications set
2、 out to develop a new headquarters building. Intelligent features were central to the design objectives.This paper discusses the features CLEAR thought make a building intelligent and identifies the objectives that drove the project. Some of these features are described in detail together with the b
3、enefits they were designed to bring to the business. Lastly, the paper considers some constraints and risks that affected the project.The CLEAR Centre ProjectWho is CLEAR Communications? CLEAR Communications is a telecommunications company. Founded in 1991 following the deregulation of the telecommu
4、nications market in New Zealand, CLEAR grew very rapidly. Initially CLEAR principally addressed the toll market, however now CLEAR offers the full range of telecommunications services. We have our own internet service provider, CLEARNet, and we have recently concluded a strategic alliance with Vodaf
5、one to resell mobility. We have our own fibre optic cable and microwave radio backbone running from Whangarei, some 170 kms north of Auckland, to Invercargill in the far south. We have a fully digital switch and transmission system, with switches based in Auckland, Wellington and Christchurch. Since
6、 mid 1999 CLEAR has been a wholly-owned subsidiary of British Telecom.Why CLEAR wanted to move By 1996 CLEAR had about 800 staff in 14 locations around the country, but the majority were based in Auckland where we occupied 11,530 m2 of space on 17 floors of three separate buildings. There was very l
7、ittle scope for further growth. About 0.5km separating the buildings, and employees spent a considerable amount of time moving between buildings and between floors.The leases on all six floors in the two smaller buildings, total ling 3,810 m2, were due to terminate between August and December 1998.
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

