外文翻译-使用微震震源参数对冲击地压危险性进行评估.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 使用 震源 参数 冲击 地压 危险性 进行 评估
- 资源描述:
-
1、FROM: PURE AND APPLIED GEOPHYSICS,1998.6,10(1):4165附录Use of Microseismic Source Parameters for Rockburst Hazard AssessmentJANE M. ALCOTT1, PETER K. KAISER1 and BRAD P. SIMSER2 1.Geomechanics Research Centre, Laurentian University, Sudbury, Ontario, P3E 2C6, Canada. 2.Noranda Mining and Exploration L
2、td., Brunswick Mining Division, P.O. Box 3000, Bathurst, New Brunswick, E2A 3Z8, Canada. Abstract:Since 1994 Norandas Brunswick #12 Mine has complemented their MP250/Queens Full Waveform seismic systems with an ISS (Integrated Seismic System). Time histories of ISS source parameter information form
3、a component of the daily ground control decision-making. This paper discusses a methodology for microseismic hazard assessment, which filters ISS data using energy, apparent stress and seismic moment criteria to identify those events that are relevant for the assessment and decision-making process.
4、Seismic events are classified into four groups: (1) no or minor hazard; (2) seismically-triggered, gravity-driven hazards; (3) stress-adjustment-driven hazards resulting in bulking due to rock mass fracturing; and (4) deformation-driven hazards exploiting existing rock mass damage. Three case histor
5、ies from 19941996, for the 1000 Level South and the 850 Level at Brunswick Mine, are analyzed using this technique to calibrate and verify the proposed methodology.Key words: Rockbursts, hazard assessment, microseismicity, source parameters.Introduction Many research efforts have been directed towar
6、d eliminating, mitigating and minimizing rockburst hazard by improved mine design methods, design of energy absorbing or yielding rock support systems, and by better rockburst anticipation techniques (CAMIRO, 1997). Bursting conditions are usually not experienced early in a mines life; and thus litt
7、le effort may be placed on preventing burst-prone conditions during mine planning. If problems are encountered later in mine life, it is often not possible to alter the mining method or sequence and ground control engineers may be forced to live with seismicity, requiring procedures to identifypoten
8、tial rockburst hazards and to ensure adequate ground support to minimize risk. Norandas Brunswick no.12 Mine, located in Bathurst, NB, Canada, is a 9000 tonnes per day, zinc-lead-copper-silver operation. Brunswick has a history of microseismicity and has experienced rockburst-related damage to under
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


卧式机床六工位数控回转刀架结构仿真.doc

