书签 分享 收藏 举报 版权申诉 / 19

类型外文翻译-高预应力强力支护系统的发展及其在煤矿巷道中的应用.doc

  • 文档编号:20195
  • 上传时间:2024-03-19
  • 格式:DOC
  • 页数:19
  • 大小:209.52KB
  • 配套讲稿:

    如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。

    特殊限制:

    部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。

    关 键  词:
    外文 翻译 预应力 强力 支护 系统 发展 及其 煤矿 巷道 中的 应用
    资源描述:

    1、翻译部分英文原文Development of high pretensioned and intensive supporting systemand its application in coal mine roadwaysKang Hongpu, Lin Jian, Wu YongzhengCoal Mining and Designing Branch, China Coal Research Institute, Hepingli, Chaoyang District, Beijing 100013, ChinaAbstract: In view of the features of

    2、complicated and difficult roadways, the present problems on rock bolting technique were analyzed, and the high pretensioned and intensive supporting theory was put forward. The initial supporting stiffness and strength of bolting system should be increased largely to control the dilatant deformation

    3、 and maintain the integrity of surrounding rock. The high pretensioned and intensive bolt and cable system was developed, and the mechanical properties of the bolting components were obviously improved. This system has been successfully applied in the 1000m deep entries in Xinwen coal field, and the

    4、 entries affected by intense mining activities in Luan coal field. The deformation of the entries was reduced by a big margin. This system provides an effective supporting form for complicated and difficult roadways. Keywords: roadways; rock bolting; high pretensioned stress; intensive supporting; u

    5、nderground applications 1 Introduction With the increases of coal mining intensity and limit, the depth of roadways in underground coal mines in China is getting larger and larger with the maximum mining depth up to 1365m; geological conditions of the roadways become more and more complicated; and t

    6、he locations, sections and stress states of the roadways tend to be unfavourable to their stabilities. These trends of the roadway layout pose higher and stricter requirements to bolting technique. For this purpose, study and testing on the complete bolting technique have been carried out in several

    7、 coal fields, and the research results have been utilized in different roadway conditions, and improved the supporting performance sharply. At present, in China, the rate of bolting accounts for 60% in total roadways in many coal fields, even 100% in some coal fields. However, some problems are stil

    8、l present though great progress has been made in bolting technique. The supporting performance of high strength bolting is poor in deep and complicated roadways, and the bolting components are destructed severely. In general, the problems are summarized as follows: Low supporting stiffness. The supp

    9、orting stiffness is associated with pretensioned stress and anchorage types, and the high supporting stiffness can only be achieved by combination of high pretensioned stress with full-length anchorage. The spin moment to install bolts only amounts to 100-150N.m, or the pretensioned force is up to 1

    10、5-20kN at most cases. Low tendon strength for bolts and cables. For existing tendons used for high strength bolts, the yield strength is about only 335-400MPa, while the broken strength is about 500-600MPa. The diameter of cables is 15.2-17.8mm, and the broken force is about 260-350kN. Poor end thre

    11、ad quality. Poor thread quality will increase the frictional forces between the nuts and threads, and lower the transiting rate from the spin moment of nuts to pretensioned force of tendons. On the other side, the poor thread quality will also worsen the rear stress state, result in shearing, bendin

    12、g, rupture. Devaluating surface proof components, such as plate, strap, and metal mesh. Straps with low strength and stiffness are commonly used to lower the cost of material, decrease the capability of surface proof and affect the total supporting performance. High density of bolts. More bolts per

    13、square meter and more installing time, will bring down the rate of roadway advance. To solve the above problems, the high pretensioned and intensive supporting system was developed based on the relative supporting theory. 2 High pretensioned and intensive supporting theory At present, there exist tw

    14、o different theories for supporting complicated and difficult roadways with high stresses and large deformation. 2.1 Secondary supporting theory According to secondary supporting theory, supporting for roadways with high stresses and large deformation should be divided into two phases. The first sup

    15、porting should permit the surrounding rock to deform and release the stress when the stability of roadways is secured; the second supporting should be installed to keep the long term stability of roadways at a definite interval. This theory has been widely accepted and applied, and very good perform

    16、ance has been obtained in some definite conditions. But this theory is facing more and more challenges with the increase of mining depth, and the additional complicated, geological and mining conditions. In roadways with depth up to 1000m, or roadways affected by intense mining activities, or cut by geological discontinuities, weak and broken rock zones, the deformation has been still unaccepted after secondary supporting, and the third or

    展开阅读全文
    提示  图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
    关于本文
    本文标题:外文翻译-高预应力强力支护系统的发展及其在煤矿巷道中的应用.doc
    链接地址:https://www.thwenku.com/cad/20195.html
    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    网站客服QQ:2356858848

      客服联系电话:18503783681

    copyright@ 2008-2022 thwenku.com网站版权所有

    ICP备案:豫ICP备2022023751号-1