外文原文-位于英国沃灵顿市柴郡的arpley垃圾填埋场的渗滤液问题.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 原文 位于 英国 沃灵顿市柴郡 arpley 垃圾 填埋场 渗滤 问题
- 资源描述:
-
1、Remediation Of Leachate Problems At Arpley Landfill Site ,Warrington, CheshireH. ROBINSON (1), S. FARROW (2), S. LAST (3) & D. JONES (4)(1) Technical Director: Enviros Consulting Limited, Shrewsbury, UK. (2) Group Environment Manager: Waste Recycling Group plc, Lincoln, UK.(3) Technical Manager, Env
2、iros Consulting Limited, Shrewsbury, UK. (4) Technical Manager, Leachate: Waste Recycling Group plc, Chester, UK.AbstractWhen Waste Recycling Group (WRG) took over Arpley Landfill in Spring 1999, it inherited a site where leachate was up to 8 metres above consented levels. After tankering over 200,0
3、00m3 of leachate for treatment off-site, investing nearly 3 million in leachate extraction infrastructure and a state-of-the-art on-site leachate treatment plant, discharging into the River Mersey, the site is being transformed. The plant was commissioned in October 2001, and has already treated nea
4、rly 150,000 cubic metres of exceptionally strong leachate, to very high standards suitable for discharge into the River Mersey. Dramatic reductions in leachate levels have been achieved in all areas of the landfill site, with the great majority of locations either within, or close to, compliant leve
5、ls. This paper describes how the project has been implemented, and presents detailed operational data for the leachate management and treatment system. In terms of loads of contaminants being treated, the Arpley plant is almost certainly the largest leachate treatment plant in the UK, and represents
6、 a successful demonstration of use of Best Available Technology, to solve a serious leachate problem.Keywords: Landfill leachate,The leachate management1.ArpleylandfillArpley Landfill Site is located on the south bank of the River Mersey, west of Warrington, on 130 hectares of land, originally used
7、for disposal of dredgings from the Mersey and from the Manchester Ship Canal. Since it opened in October 1988, the site has received more than 10 million tonnes of domestic, commercial and industrial wastes, emplaced to depths of up to 30 metres, and continues to accept about 800,000 tonnes per year
8、 of primarily domestic wastes. Infilled areas are being progressively restored to a mixture of agriculture, woodland and public open space, being blended into the important 186 acre Moore Nature Reserve, which adjoins the site and is managed and funded by WRG (Warrington Worldwide, 2003). Wastes hav
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

