1、毕业设计(论文)外文资料翻译院 系专业学生姓名班级学号外文出处附件:1.外文资料翻译译文(约3000汉字); 2.外文资料原文(与课题相关的1万印刷符号左右)。指导教师评语:指导教师签名:年月日外文文献:GRAPHICAL-BASED MULTISTAGE SCHEDULING METHOD FOR RC BUILDINGSY. C. HUANGDepartment of Construction Management, Hwa Hsia Institute of Technology and Commerce, 111 Hwa Hsin Street,Chung Ho City, Taipe
2、i Hsien, Taiwan, Republic of ChinaReceived 13 February 2004; accepted 4 March 2005In Taiwan, contractors are becoming specialized in certain types of construction in an increasingly competitive environment and this specialization requires some scheduling models to provide better scheduling results f
3、or each type of construction. A new practical method, Graphical-Based Multistage Scheduling Method (GMSM),for scheduling RC building superstructures is presented herein. From the analysis of characteristics and construction custom of RC buildings, four constraints, (a) downup construction, (b) build
4、ing inspection, (c) reuse of beam forms, and (d) reuse of slab forms, can be established. The GMSM is developed utilizing a graphical-based method and the concept of resource reuse, and the general form of the GMSM to be facilely implemented in any worksheet software is derived as well. The results
5、of this study provide some quantitative information as a useful guide for scheduling RC building superstructures.Keywords: Multistage scheduling, repetitive project, RC building, GMSMIntroductionIn Taiwan, contractors are becoming specialized in certain types of construction in an increasingly compe
6、titive environment and this specialization requires some scheduling models to provide a better scheduling for each type of construction. The majority of high-rise buildings located in urban areas in Taiwan are RC structures. It is deemed crucial for high-rise buildings that a scheduling model for th
7、is type of construction can not only increase profits but also reduce the impact on urban traffic.Of the high-rise buildings constructed to date, the network planning technique has been commonly adopted in scheduling. The Critical Path Method (CPM) is the most popular one; for instance, prevalent sc
8、heduling software such as MS Project, Primavera Project Planner, etc., were developed based on CPM. However, assuming that all activities are independent, the CPM does not take into consideration the resource reuse where there is repetition of identical activities on every floor.OBrien (1975) propos