外文翻译-应用识别和人工神经网络在电力系统负荷预测.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 应用 识别 人工 神经网络 电力系统 负荷 预测
- 资源描述:
-
1、英文部分Application of Pattern Recognition and Artificial Neural Network to Load Forecasting in Electric Power System ABSTRACT Electric power system load forecasting plays an important role in the Energy Management System (EMS),which has great influence on the operation,controlling and planning of elect
2、ric power system. A precise electric power system short term load forecasting will result in economic cost saving and improving security operation condition. With the develop-ment of deregulation in electric power system,the method of short term load forecasting with high accuracy is becoming more a
3、nd more important. Due to the complicacy and uncertainty of load forecasting,electric power load is difficult to be forecasted precisely if no analysis model and numerical value algorithm model is applied. In order to improve the precision of electric power system short term load forecasting,a new l
4、oad forecasting model is put foreword in this paper .This paper presents a short-term load forecasting method using pattern recognition which obtains input sets belong to multi-layered fed-forward neural network,and artificial neural network in which BP learning algorithm is used to train samples. L
5、oad forecasting has become one of the major areas of research in electrical engineering in recent years. The artificial neural network used in short-time load forecasting can grasp interior rule in factors and complete complex mathematic mapping. Therefore,it is world wide applied effectively for po
6、wer system short-term load forecasting. Index terms:artificial neural network (ANN), back propagation (BP), learning algorithm, load forecast, pattern recognition. 1. INTRODUCTION Short-term load forecasting has been useful in safe and economical planning operation of an electrical power system. It
7、has been also used in start-up and shut-down schedules of generating units,overhaul planning and load management. One of the characteristics of electric power is that it cant be stockpiled,that is,the power energy is generated,transmitted,distributed and consumed at the same time 1. In normal workin
8、g condition,system generating capacity should meet load requirement anytime. If the system generating capacity is not enough,essential measure should be taken such as adding generating units or importing some power from the neighboring network. On the other hand,if the system generating capacity is
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

