外文原文-选煤厂优化现有优化方法的修正.pdf
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 原文 选煤 优化 现有 方法 修正
- 资源描述:
-
1、Coal preparation plant optimization:A critical review of theexisting methodsV.Gupta1,M.K.Mohanty*Department of Mining and Mineral Resources Engineering,Southern Illinois University at Carbondale,Carbondale,Illinois 62901-6603,United StatesReceived 19 July 2005;received in revised form 13 November 20
2、05;accepted 15 November 2005Available online 4 January 2006AbstractA coal preparation plant typically operates with multiple cleaning circuits to clean individual size fractions of run-of-mine coal.Coal preparation plants are traditionally optimized using the equalization of incremental product qual
3、ity approach.Individualcleaning circuits are operated at the same specific incremental product quality so that the targeted overall plant product quality isachieved.Over the years,it has been well established that equal incremental product quality approach maximizes plant-yield for agiven product qu
4、ality constraint.However,while dealing with multiple quality constraints,the incremental quality approach may not provide a completesolution to the optimization problem.It may be intuitive to realize that the dirtiest particle(s)in a coal product,with respect toash content,may not be the same partic
5、le(s)with respect to sulfur content.Therefore,with increasing number of product qualityconstraints,which may include(but not limited to)limiting ash,sulfur and trace element contents,the plant has to be optimizedbased on each incremental product quality.Understandably,the operating points selected f
6、or each circuit to maximize plant-yieldbased on incremental ash content,may not be suitable for obtaining maximum plant yield based on incremental sulfur content.These limitations of the equalization of incremental product quality approach to satisfy multiple product quality constraints havebeen rev
7、iewed in detail in this publication with an example of ash and sulfur data collected from an operating coal preparationplant.D 2005 Elsevier B.V.All rights reserved.Keywords:coal;plant optimization;incremental product quality;coal washability1.IntroductionBased on the size consist of the Run-of-mine
8、(ROM)coal,a preparation plant utilizes three or four individualcircuits to clean the entire ROM coal.For example,coalcoarser than 12.5 mm may be cleaned in a heavymedium vessel circuit,12.5?1 mm in a heavy mediumcyclone circuit,1 mm?150 Am in a spiral circuit andminus 150 Am size coal in a flotation
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


盘槽式气液分布器cad图纸.zip

