1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分共包括10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度、设计生产能力及服务年限;4.井田开拓;5.准备方式-采区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风;10.矿井基本技术经济指标。一般部分为刘庄矿2.4Mt/a新井设计。刘庄井田位于安徽省阜阳市颍上县北部,交通便利。井田走向(南北)长约5.32km,倾向(东西)长约2.12km,井田总面积为11.28km2。主采煤层为13-1号煤层,平均倾角为14,煤层平均总厚为18.51m。井田地质条件较为简单。井田工业储量为296.14Mt,矿
2、井可采储量175.55Mt。矿井服务年限为56.25a,矿井正常涌水量为550m3/h,最大涌水量为960m3/h。矿井瓦斯涌出量较低,为低瓦斯矿井。井田划分为二水平,第一水平标高为-680m,第二水平标高为-930m,双立井开拓,主井装备箕斗,副井装备罐笼。大巷采用胶带输送机运煤,辅助运输采用1.5t厢式矿车运输。矿井通风方式为两翼对角式通风。矿井年工作日为330d,工作制度为“四六”制。专题部分题目为:基于谢苗诺夫热自燃理论的瓦斯爆炸控制理论及技术研究翻译部分题目为:World coal liquefaction technology progress and the policy of
3、China关键词: 新井设计; 井田开拓; 采煤方法;ABSTRACTThis design consists of three parts: the general part, the special part and translated part.This design includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.development
4、engineering of coalfield; 5.The layout of panels; 6. The method used in coal mining; 7. Transportation of the underground; 8.The lifting of the mine; 9. The ventilation and the safety operation of the mine; 10.The basic economic and technical norms.The general part is a new design of liuzhuang mine.
5、 Liuzhuang mine lines in Northeast of Fuyang in Anhui province. The traffic of road and railway is very convenience to the mine. The geological structure of this area is simple. The Length of the minefield is 5.32 km ,the width is about2.12km,the area is 11.28km2.The13-1 is the main coal seam, and i
6、ts dip angle is 14 degree. The thickness of the mine is about 18.51m in all. The proved reserves of the minefield are 296.14 million tons. The recoverable reserves are 175.55million tons. The designed productive capacity is 24 million tons percent year, and the service life of the mine is 56.25years
7、. The normal flow of the mine is 550m3 percent hour and the max flow of the mine is 960m3 percent hour, and the gas of the mine is low gaseous mine.The field has been divided two mining levels. The first level should be located at the lever of -680m, The second level should be located at the level o