1、摘要:王村井田位于合阳县与澄城县的交界处,矿井工业场地选择在王村公社附近,东距合阳县8公里,西距澄城县16公里。工业场地附近,地形平坦,地面标高一般在+710+760米左右,黄土覆盖厚达150200米。 井田东西走向长15公里,南北倾斜宽3公里,井田面积45平方公里.井田地质储量为20717万吨,设计的可采5号煤层地质储量为14236万吨,占总储量的68.7%。根据地质储量,扣除工业场地、井筒、铁路、河流和村庄煤柱,以及开采损失的煤量后,采区回采率按80%计算,井田的可采储量为9680万吨。由于煤层埋藏较深,赋存情况比较稳定,所以本矿井设计为单水平生产,采用一对立井的开拓方案,矿井的生产能力为
2、90万吨,采用走向长壁式综采,一次采全高后退式采煤法。矿井设计年工作日为300天,每天三班作业,两班采煤一班准备,每班工作8个小时,每日净提升时间为14小时,矿井服务年限为74年。井田煤层赋存平缓、构造比较简单,工作面采用综合机械化采煤,设计确定工作面长度为150米, 工作面年推进度为1440米。本矿井属于低级瓦斯矿井,有煤尘爆炸危险,煤层不易自然,低温情况正常,属“无热害区”井田。矿井采用抽出式通风。每一个生产水平和每一个采区,都必须布置单独的回风道,实行分区通风。 煤炭在井下主要以胶带运输为主,运到井底煤仓后再经箕斗提升至地面。井底车场的通过能力完全可以满足生产需求,使煤炭资源源源不断的运
3、至地面,为社会的发展提供了一定的动力。关键词:王村矿;走向长壁式;井田开拓;采区;通风;提升Abstract:Wang village well-field is located in He Yang County and the Cheng Cheng County border, Mine industry space chooses in Wang made contributionforthedevelopment of society village commune nearby, 8 kilometres of east spur He Yang County, 16 kilome
4、tres of west spur Cheng Cheng County. the landform of the Industry is flat,The floor altitude generally between+710- - +760 meters, the loess is covered thickly amounting 150 to 200 meters.The trend is 15 kilometres from east to west long, north and south incline is broad 3 kilometres, Well-field co
5、vers an area of 45 square kilometers,and the geology reserves are 207,170,000 tons,the design of coal mining on the 5th geological reserves of 142.36 million tons , account for 68.7% of reserves general. Be based on the geology reserves, deduct the industry space,shaft, railroad, river and village c
6、oal post, And exploit the coal amounts losing,mining extraction rate by 80% calculation, mines recoverable reserves is 96.8 million tons .Because of the coal seam hide deeper, tax stores condition stabilizing comparatively,the design of the mine is a production of Single-level , the pioneering progr
7、am adopt a pair shaft, the mine production efficiency is 900,000 tons, Adopt the trend increases wall style exploit synthetical, The once gathers entire high recession style coal mining method. The shaft designs that the annual workday is 300 day,and three classes in every day , two shifts cut coal