1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为崔家寨煤矿150万t新井设计,共分10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度、设计生产能力及服务年限;4.井田开拓;5.准备方式-采区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全技术;10.矿井基本技术经济指标。一般部分针对河北崔家寨矿井进行了井型为1.5Mt/a的新井设计。崔家寨矿井位于河北省境内,井田走向长约8.0km,倾向长约3.2km,面积约25.6km2。主采煤层为5#煤层,平均倾角312,平均厚度3.12m。井田工业储量为145.03Mt,可采储量108.77M
2、t,矿井服务年限为51.80a。矿井正常涌水量为140m3/h,最大涌水量为600m3/h;矿井相对瓦斯涌出量为1.732m3/t,属低瓦斯矿井。针对首采工作面进行了采煤工艺设计。该工作面煤层平均厚度为3.12m,平均倾角6.7。工作面采用长壁综采一次采全高采煤法。采用双滚筒采煤机割煤,往返一次割两刀。采用“四六制”工作制度,截深0.6m,每天9个循环,循环进尺5.4m,月推进度162m。大巷采用胶带输送机运煤,辅助运输采用蓄电池式电机车牵引固定箱式矿车。主井采用两个16t侧卸箕斗提煤,副井采用一对1t矿车双层四车窄罐笼和一个带平衡锤的1t矿车双层四车宽罐笼运料和升降人员。专题部分题目为巷道锚
3、杆支护。翻译部分题目为Optimization model of Coal Mine roadway layout system Based on Evidence Theory and Its Application,主要介绍了优化巷道布置系统模型的理论依据及其应用。关键词:崔家寨矿井;双立井;综采采全高;两翼对角式ABSTRACTThe general design is about a 1.50 Mt/a new underground mine design of Cuijiazhai coal mine. Cuijiazhai coal mine is located in Heib
4、ei. Its about 8.0 km on the strike and 3.2 km on the dip, with the 25.6 km2 total horizontal area. The minable coal seam is 5# with an average thickness of 3.12 m and an average dip of 6.7. The proved reserves of this coal mine are 145.03 Mt and the minable reserves are 108.77 Mt, with a mine life o
5、f 51.80 a. The normal mine inflow is 140 m3/h and the maximum mine inflow is 600 m3/h. The mine gas emission rate is 1.732 m3/t which can be recognized as low gas mine. The design conducted coal mining technology design against the first face. The coal seam average thickness of this working face is
6、3.12 m and the average dip is 6.7. The working face applies fully mechanized longwall full-height coal caving method, and uses double drum shearer cutting coal which cuts twice each working cycle. Four-Six working system has been used in this design and the depth-web is 0.6 m with nine working cycle
7、s per day, and the advance of a working cycle is 5.4 m and the advance is 162 m per month.The monographic study is Bolting for Coal Lane.The title of the translated academic paper is Optimization model of Coal Mine roadway layout system Based on Evidence Theory and Its Application .Keywords:Zhuji co