司马煤矿2.4Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 司马 煤矿 2.4 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为司马煤矿2.4 Mt/a新井设计。司马煤矿位于长治县境内,行政区划隶属长治县苏店镇,北距长治市14km,交通便利。井田范围近一六边形,长宽各约6km,总面积29.494km2。井田内主采煤层为一层,为3#煤。煤层倾角平均3,平均厚度6.8 m。井田地质条件较为简单。矿井工业储量为26897.94万t,可采储量为21832.74万t。矿井设计生产能力为2.4Mt/a。矿井服务年限60.6 a。矿井涌水量不大,正常涌水量为111m3/h,最大涌水量为201m3/h。矿井相对瓦斯涌出量为0.67m3/t,属低瓦斯矿井。矿井煤尘具有爆炸
2、危险性,但煤层不易自燃。矿井采用立井单水平开拓。一矿一面,采煤方法为综合机械化放顶煤开采。全矿采用胶带运输机运煤,辅助运输采用矿车。矿井通风方式前期为中央并列式。 矿井年工作日为330 d,日净提升时间16h,工作制度为“三八制”。专题部分题目是煤矿粉尘防治技术研究。在煤矿开采中,掘进、回采、运输各环节中都会产生大量粉尘,粉尘不仅会危害井下职工的身体健康,还可能导致煤尘爆炸等恶性事件。目前国内外粉尘的防治技术主要在减尘、降尘、排尘、隔尘、捕尘、个体防护六个方面展开研究。翻译部分主要内容为关于煤矿火灾模型,英文题目为:Recent Developments and Practices to Co
3、ntrol Fire in Undergound Coal Mines。关键词:立井;带区;综放;齿轨卡轨车运输;中央并列式通风ABSTRACTThe design includes three parts: the general part of the thematic part and translation part.The general part of the Sima coal mine 2.4 Mt / a new well design. Sima coal mine in Changzhi County administrative divisions under the
4、Changzhi County Su Zhen, south of Changzhi City, 14km, and convenient transportation. The Ida scope of nearly hexagonal, length and width of about 6km, with a total area of 29.494km2. Ida within the main coal layer to layer 3 # coal. Seam dip an average of 3 , the average thickness of 6.8 m. Ida geo
5、logical conditions is relatively simple.Mine industrial reserve of 268,979,400 tons, recoverable reserves of 218,327,400 tons. Mine design production capacity of 2.4Mt / a. Mine the service life of 60.6 a. Mine water is not the normal inflow of 111m3 / h, the largest inflow of 201m3 / h. Mine relati
6、ve gas emission 0.67m3 / t, is a low-gas coal mine. Mine coal dust explosion hazard, but the seam difficult to spontaneous combustion.Mine Shaft single level pioneering. A side of the mine, mining methods for integrated mechanized top coal caving. All mine by belt conveyor to transport coal, auxilia
7、ry transport using the mine car. Mine ventilation mode early as the central parallel.Mine working days for the 330 d, net upgrade time 16h, the system of work 38 system.The thematic part of the topic coal mine dust control techniques. In coal mining, tunneling, mining, transport links will have a lo
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


小型轧钢机设计(毕业文档+二辊DWG图纸).zip