城郊煤矿1.2Mta新井设计【专题综放沿空掘巷窄煤柱留设数值模拟研究】.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 专题综放沿空掘巷窄煤柱留设数值模拟研究 城郊 煤矿 1.2 Mta 设计 专题 综放沿空掘巷窄煤柱留设 数值 模拟 研究
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为永煤集团城郊煤矿1.2Mt/a新井设计。全篇共分为十个部分:矿井概况及井田地质特征、井田境界及储量、矿井工作制度、设计生产能力、井田开拓、矿井基本巷道、采煤方法、采区巷道布置、井下运输、矿井提升、矿井通风与安全和矿井主要经济技术指标。城郊矿位于河南省永城市境内。井田东西走向平均长3.83km,南北平均宽4.63km,面积约17.6km2。 井田内可采煤层为二2煤,其赋存稳定,厚度平均为7.13m,倾角平均7,为缓倾斜煤层。井田内工业储量为17.6亿t,可采储量为1.17亿t。矿井平均涌水量为200300m3/d,井田中各煤层沼气
2、含量一般小于5cm3/g,属低沼气矿井。各煤层均无煤尘爆炸危险。各煤层均属不自燃发火煤层;地温2930。城郊煤矿年设计生产能力为1.2万t/a,服务年限为67.9年。采用立井开拓,暗斜井延深的开拓方式。工作制度为“三八”制。第一水平标高为450m,第二水平标高为-750m。矿井采用倾斜长壁综合机械化采煤法,放顶煤开采。矿井布置一个综采工作面,面长168m。煤炭通过胶带输送机运输。矿井通风方式为中央并列式。专题部分:专题题目为“综放沿空掘巷窄煤柱留设数值模拟研究”。主要分析了窄煤柱宽度对沿空巷道的影响。翻译部分:翻译了一篇Mahendra Singh n与Bhawani Singh发表的论文,题
3、目为“改进的莫尔-库仑准则对非线性三轴和多轴节理岩石的强度影响” 。关键词:立井;采区;胶带运输;中央并列式ABSTRACTThis design contains three parts: the general,the special subject and the translation.The general part is a new design of Chengjiao Mine in Yongcheng coal & electricity combine. The whole article is divided into ten parts: the outline of
4、the mine, the mine field geology, the boundary and reserves, the designed productive capacity, the service life and working area, the coal transportation, the mine lifting, the ventilation and safety, and the main economical and technological index of the mine.The chengjiao mine located in the Wing
5、city in Henan Province. The Ida toward the average length 3.83km, north and south an average width of 4.63km, an area of about 17.6km2. Ida within the coal layer, the occurrence of stability for the two 2 coal, the average thickness of 7.13m, dip an average of 7 , gently inclined coal seam. Ida with
6、in the industrial reserves of 1.76 billion tons of recoverable reserves of 117 million tons. Mine the average water inflow of 200 300m3 / d, Ida coal-bed methane content is generally less than 5cm3 / g, is a low methane mine. The coal seam there was no danger of dust explosion. Each seam are not spo
7、ntaneous combustion of coal; ground temperature 29 30 .chengjiao coal mine design production capacity of 12,000 t / a, length of service was 67.9 years. Using vertical shaft open up, open up the way the dark deep inclined shaft extension. The system of work for the 38 system. The first level of elev