长平四矿3.00 Mta新井设计.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 长平四矿3.00 Mta新井设计 平四 3.00 Mta 设计
- 资源描述:
-
1、摘 要本设计是长平四矿3.0Mt/a新井设计,设计矿井为一井一面的高产高效矿井。长平四矿位于山西省高平市西面,交通便利。井田走向长度约5.0km,倾向长度约3.8km,井田总面积为18.94km2。通过对地质资料的深入分析,采用立井单水平开拓方案。主井、副井和风井均位于井田中部,采用中央并列式通风。井田内有三个煤层,且间距小,煤层倾角平均6左右。根据煤层赋存条件和井田地质构造特点,采用岩层大巷布置,通过斜巷进入煤层,井底车场位于+410m岩层中。采煤方法采用倾向长壁采煤法。,工作制度为“三八”制,矿井年工作天数为330日。在设计中,对大巷的布置方式进行了技术经济比较。全矿分为四个带区和一个盘区
2、。采用跳采,沿空掘巷,减少了煤柱损失,增加了矿井的生产效益。在设计中。为了尽可能地实现集约生产,采用一井一面的高效矿井模式。在设计中,采用了综采综掘等先进工艺和技术。这不仅提高了煤炭的开采和掘进效率,而且减小了建井工期和初期投资。运煤采用皮带运输。本矿大巷和平巷辅助运输采用矿车运输,工作面顺槽采用单轨吊辅助运输,提高运输能力大和运输连续性,使辅助运输更高效,更安全。通过不断优化设计,优化开采布局,简化生产系统,通过采用先进的技术和装备,提高了开采机械化水平,实现了高度集中生产,进而达到安全、高产、高效的目标。关键词:集中布置;倾斜长壁;带区开采;沿空掘巷AbstractThis design
3、is the new mine design of Changping No.4 mine with capability of 3.0Mt/a , and it is a high production and high efficiency mine with one production and one mining face. Changping No.4 mine lies in West of GaoPingnin ShangXi province. The traffic of road and railway is very convenience to the mine. T
4、he run of the minefield is 5.0km ,the width is about 3.8km,well farmland total area is 18.942.Through an in-depth analysis of geological data, the development of vertical shaft with single level is adopted. Main shaft, auxiliary shaft and air shaft are all located in the central part of the minefile
5、d, and central ventilation with downcast shaft and upcast shaft side by side in the central of the mine field is used. There are three coal seams in the mine field, and the spacing among them is small and the average dip of coal seam is about 6. According to the coal seams deposit conditions and min
6、e field geological structure characteristics, the rock stratum roadways are used and through the inclined drift go into the coal seams, the bottom strata is laid in the rock stratum at +410 level. Coal mining methods are the stike inclined longwall mining method. The working system “three-eight” is
7、used in the mine daily produce. The year working days is 330.In the course of design, technical and economic comparison is used in the layout of development roadway. The whole mine field is divided into four strip section and one panel. In the strip section, jumping mining and roadway driven along g
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


装载机转向驱动桥三维SolidWorks模型图纸.zip
农用铺膜机机械设计.doc