济三煤矿7.0Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 煤矿 7.0 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为济三煤矿7.0 Mt/a新井设计。一般部分共包括10章:1.矿区概述及井田地质特征;2.井田境界与储量;3.矿井工作制度、设计生产能力及服务年限;4.井田开拓;5.准备方式-采区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全;10.矿井基本技术经济指标。济三煤矿位于位于山东省西南部,北距济宁市14km,东距兖州矿业集团公司所在地邹城市40km。井田内开采3上,3下,16上及17号煤层,主采3下。煤层倾角29,平均4。井田地质条件较为简单。矿井工业储量为984.65Mt,可采储量为691.08Mt。矿井设计
2、生产能力为7.0Mt/a。矿井服务年限70.5a。矿井平均涌水量516m3/h。煤层瓦斯涌出量低,属低瓦斯煤层。各煤层均有煤尘爆炸危险性,并有自然发火倾向。矿井采用立井双水平开拓(暗斜井延伸)。一矿一面,采煤方法为综合机械化大采高一次采全厚开采。全矿采用胶带运输机运煤,辅助运输采用无轨胶轮车。矿井通风方式采用中央并列式。矿井年工作日为330 d,日净提升时间16 h,工作制度为“三八制”。专题部分题目是煤与瓦斯抽采分析。翻译部分是一篇关于瓦斯突出的论文,英文题目为Application of outburst risk indices in the underground coal mines
3、 by sublevel caving 关键词:新井设计;一次采全高采高;中央并列式;盘区ABSTRACTThis design contains three parts: the general part,the special subject part and the translation.The general part is a new design of the Jisan mine. This part is divided into ten chapters: 1.An outline of the mine field geology; 2.Boundary and the
4、reserves of mine; 3.The service life and working system of mine; 4.Development engineering of coalfield; 5.The layout of mining area; 6.The method used in coal mining; 7. Transportation of the underground; 8.The lifting of the mine; 9. The ventilation and the safety operation of the mine; 10.The bas
5、ic economic and technical norms.The Jisan mine locates at the southwest of Shandong province, South of Jining City, 14km east of Yanzhou Mining Group Company is located Zoucheng 40km .Ida mining 3上 , 3 下, 16上 , and No. 17 coal seam , the main mining 3下 . The coal seams dip to 9 , an average of 4 . I
6、da geological conditions is relatively simple.The proved reserves of the minefield are 984.65million tons. The recoverable reserves are 691.08 million tons. The designed productive capacity is 7.0 million tons per year. The service life is 70.05 years. Mine average inflow of 516m/ h . Coal seam gas
7、emission in the case of low gas coal . The coal seams are dust explosion hazards and natural tendency to get angry .The development of the mine is double levels with vertical shaft at the first level and inclind shaft at the second level. The number of the working faces is only one. The mining metho
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


泵体零件的机械加工工艺规程及工艺装备设计(CAD图纸+说明书).zip
危急遮断器CAD图纸_.dwg

