东易煤矿1.8Mta新井设计.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 煤矿 1.8 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为东易煤矿1.8Mt/a新井设计。东易煤矿位于山西朔州平鲁区茂华东易煤业有限公司位于朔州市平鲁区白堂乡东北约4km处的前进村旁,交通较为便利。井田走向长度约为2.10km,倾向长度约为2.42km,面积约为4.4494km2。主采煤层9煤的平均厚度为13.61m,平均倾角为6.1,地质条件简单。井田工业储量为180.9Mt,可采储量为126.3Mt。矿井设计年生产能力为1.8Mt/a,服务年限为53.97a。矿井涌水量不大,瓦斯涌出量小,为低瓦斯矿井。井田为斜井单水平开拓。大巷运输采用胶带运输机运煤,辅助运输采用双钩串车设备。矿井
2、通风方式为中央边界式通风。矿井年工作日为330d,工作制度为“三八”制。一般部分共包括10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度及设计生产能力、服务年限;4.井田开拓;5.准备方式-带区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全技术;10.矿井基本技术经济指标。专题部分题目是关于薄煤层综采技术高产高效的探讨。主要阐述了目前国内外现状,对一些具体实例进行分析,得出具体有效的提高薄煤层综采效率的方法和措施。翻译部分主要内容为基于似膏体充填的建筑物下采煤新模式,英文题目为:A New Mode of Coal Mining Under Bui
3、ldings with Paste-Like Backfill Technology。ABSTRACTThis design includes three parts: the general part, special subject part and translated part. The general part is a 1.8Mt/a new design of Dongyi Mine. Dongyi Mine is located in Qianjin village which is northeast Baitang town of Pinglu district in Sh
4、uozhou city. The traffic of road and railway is very convenience to the mine. The length of the minefield is about 2.10 km ,the width is about2.42 km,the total area is 4.4494km2.The main coal seam is 9 coal seam, and its average thickness is 13.69m.The average angle of the mine is 6.1 degree, and th
5、e geology condition of mining is simple.The industrial reserves of the minefield are 0.1809 billion tons. Besides, The recoverable reserves are 126.3 million tons. The designed productive capacity is 1.8 million tons percent year, and the service life of the mine is 53.97 years. The inflow of the mi
6、ne is not large. The amount of gas emission is low and it is a low gas mine.The development form of the minefield is a single level in an inclined mine to expand. The belt conveyors transport coal and auxiliary transportation is done by double hook string cars. The ventilation mode is central bounda
7、ry ventilation.The working system “three-eight” is used in the Dongyi Mine. It produces mine 330 days per year.The general part includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.development engineering
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


王村矿90万吨新井设计(CAD图纸+说明书).zip

