许厂庄煤矿1.2Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 许厂庄 煤矿 1.2 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三部分:一般部分、专题部分和翻译部分。一般部分为淄博矿务局许厂煤矿1.2 Mt/a新井设计,共分十章:矿井概述及井田地质特征,井田境界和储量,矿井工作制度、设计生产能力及服务年限,井田开拓,准备方式带区巷道布置,采煤方法,矿井运输与提升,矿井通风及矿井基本技术经济指标。许厂井田位于山东济北矿区东部,隶属于济宁市管辖,西南距济宁市10km,东北距兖州市26 km,。井田南北长约8.1 km,东西宽约3.7 km,面积约30.1km2。设计开采煤层为3下煤层,厚度平均为4.2 m。煤层倾角19。井田工业储量为145.53 Mt,矿井可采储量98.57 Mt。矿井服务年限为63.2
2、a,矿井正常涌水量为200 m3/h,最大涌水量为290 m3/h。矿井为低瓦斯矿井。许厂煤矿矿井工作制度为“四六”制,一个综采工作面保产。开拓方式为立井两水平直接延伸,水平标高分别为-240 m,-355 m,准备方式为带区巷道布置。矿井主井采用箕斗提煤,副井采用罐笼作为辅助提升。工作面采用长壁采煤法,面长160 m,采煤工艺为综采。矿井主运输为胶带运输,辅助运输采用无极绳牵引普轨卡轨车运输。矿井通风初期采用中央并列式,后期采用中央分列式。专题部分题目是软岩巷道技术研究。论文阐述了软岩巷道控制的基本理论,系统介绍了软岩巷道基于锚杆、梁、网、混凝土的基本支护技术,论述了一些行之有效的软岩巷道施
3、工的支护技术实例,并简单介绍了新奥法在我国煤矿软岩巷道支护中的实际应用及创新发展,为煤矿及其它行业提供了合理的技术借鉴。翻译部分对煤矿绿色开采技术进行了介绍,其英文题目为Mine Green Mining。关键词:立井;两水平;带区;综采;卡轨车;中央并列式通风AbstractThis design contains three parts:the general part,the special part and the translated part. The general part is a new design of Xu Chang mine belonging to Zi Bo
4、mining bureau whose production capacity is 1.2 Mt per year.It has ten chapters as follows:the outline of mine and mine field geology, boundary and reserves, working system and productive capacity and service life, development method of the mine, the main roadways, coal mining method and layout or ro
5、adways in working area,transportation of underground, mine lifting, mine ventilation and safety, main techniqueeconomic induces.The Xu Chang mine filed lies in the eastern of North mining area. Shandong economic , under the jurisdiction of Jining City , southwest from the Jining City, 10 km northeas
6、t from Yanzhou City, 26 km . Ida north-south length of about 8.1 km , 3.7 km from east to west , covering an area of about 30.1 km2. Design Coal Seam 3 seam under the average thickness was 4.2 m .The coal seams dip 19 .The proved reserves of the minefield are 145.53 million tons,and the recoverable
7、reserves are 98.57 million tons. The designed productive capacity is 1.2 million tons percent year, and the service life of the mine is 63.2 years. The normal flow of the mine is 200m3 percent hour and the max flow of the mine is 290 m3 percent hour. The mineral well gas gushes is lower, It is a low