三台矿3.0Mta新井设计.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 三台 3.0 Mta 设计
- 资源描述:
-
1、中文题目:三台矿3.0Mt/a新井初步设计外文题目:THE NEW SHAFT DESIGN OF SANTAI MINE(3.0MT/A)毕业设计(论文)共152页(其中:外文文献及译文39页) 图纸共4张 完成日期 年6月 答辩日期 20XX年6月摘要三台矿拥有两层可采煤层,煤厚分别是5m和14m。煤层南北约为5335km,东西约为3028m,井田面积约为14.95 km2。平均倾角为5.6度。工业储量为3.85亿吨,设计储量为3.71亿吨,可采储量为3.44亿吨。本设计从矿井的开拓、开采、运输、通风、提升及工作面的采煤方法等各个环节进行了详细的叙述,设计严格遵守设计规范和煤矿安全规程。本
2、设计采用单水平立井开拓,主井采用箕斗提升,副井采用罐笼提升,大巷采用集中布置。通风方式为中央并列式。采煤方法采用大采高一次采全厚的采煤方法,采煤工艺是综采。工作面支护方式为支撑掩护式支护方式,端头支护采用端头支架。本次设计是三台矿新井设计,地质资料都是在实习矿上搜集的,在指导教师的指导下,合理运用平时及课堂上积累的知识,查找有关资料和文献,力求设计出一个安全、高效的现代化矿井。关键词:单水平立井开拓;中央并列式;大采高一次采全厚;综采AbstractThe Santai mine has two layers of coal layer. Coal thickness is 5m and 14
3、m, respectively. The distance from north to south of seam is about 5335km. The distance from east to west of seam is about 3028m. Area of mine is approximately 14.95 km2. The average inclination is 5.6 degree. Industrial reserves is 385 million tons. The design reserves is 371 million tons. The reco
4、verable reserves is 344 million tons. The design from all aspects is mine development, mining, transport, ventilation, upgrade and face mining methods described in detail. Design in strict compliance with the design specifications and Coal Mine Safety Regulations. This design uses single-level verti
5、cal shaft development. The main shaft hoist with skip. The auxiliary shaft hoist with cage. Roadway arrange. centralized. Ventilation is the central parallel. Mining method is large mining height mining at one time full thickness. The mining process is fully mechanized mining. The face support is su
6、pport and shield type support End support use end bracket. This design is the design of the Santai mines of new wells. Geological data are collected in the practice mine. Under the guidance of the instructor , I use rationally the accumulated knowledge on the usual and the classroom. And find releva
7、nt information and documentation. Strive to design a safe, efficient and modern mine. Keywords: single-level vertical shaft development; central parallel; large mining height mining at one time full thickness; fully mechanized coal mining faceI目录前言11井田概况及地质特征21.1井田概况21.1.1井田边界四邻及面积21.1.2交通位置21.1.3地形
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


汽车液压助力转向系统设计 (CAD图纸+说明书).zip
水位自记井方案图CAD图纸.dwg

