开滦集团范各庄东矿2.4Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 开滦 集团 范各庄东矿 2.4 Mta 设计
- 资源描述:
-
1、设计总说明一般部分针对范各庄东矿进行了井型为2.4Mt/a的新井设计。范各庄东矿位于唐山市古冶区境内,面积约10.98km2。主采煤层为5#、17#煤层,5#煤层平均倾角13,平均厚度5.0m;7#煤层平均倾角13,平均厚度6.1m。井田工业储量为250.3Mt,可采储量188.5Mt,矿井服务年限为56.1a。矿井正常涌水量为39t/min,最大涌水量为3180t/min;矿井相对瓦斯涌出量为0.12m3/t,属5瓦斯矿井。根据井田地质条件,设计采用双立井两水平开拓方式,二水平采用暗斜井延伸,井田采用采区式布置方式,共划分为五个采区,运输大巷、轨道大巷都布置在岩层中。矿井通风方式采用中央边界
2、式通风。 针对南一采区进行了采区准备方式设计,进行了运煤、通风、运料、排矸、供电系统设计。针对3101工作面进行了采煤工艺设计。该工作面煤层平均厚度为5.00m,平均倾角13。工作面采用一次采全高综采采煤法。采用双滚筒采煤机割煤,往返一次割两刀。采用“四六制”工作制度,截深0.8m,每天六个循环,循环进尺4.8m,月推进度144m。大巷采用胶带输送机运煤,辅助运输采用矿车运输。专题部分题目深埋高应力回采巷道变形破坏规律及支护对策研究。The Brief Introduction Of The DesignThe design for the general part of Fangezhuan
3、g mine east were well is designed by Nii 2.4Mt/a. Fan Zhuang east mine is located in Guye District of Tangshan City, an area of about 10.98km2. The main mining coal seam is 5# and 17# coal seam, the average dip angle of 5# coal seam is 13 degrees, the average thickness is 5.0m; the average dip angle
4、 of 7# coal seam is 13 degrees, and the average thickness is 6.1m. Mine industrial reserves of 250.3Mt recoverable reserves 188.5Mt, the service life of the mine is 56.1a. The normal mine inflow 39t/min. The maximum inflow of 3180t/min; mine relative gas emission quantity for 0.12m3/t, genera and 5
5、gas mine.Based on the geological conditions of the mine, the design adopts the double shaft two level to open up the way, two levels of the dark shaft extends, mine adopts mining arrangement is divided for five mining area, roadway and track big lane are arranged in the rocks. Central boundary venti
6、lation for mine ventilation.For a mining area south of mining area design preparation, the coal, ventilation, and transport material, gangue, power supply system design.Coal mining technology design was carried out for 3101 working face. The average thickness of the coal seam is 5.00m, with an avera
7、ge dip angle of 13 degrees. A fully mechanized coal mining face by the. Double drum shearer cutting coal, and from a cutting two knives. The four six working system, cutting depth 0.8m, six cycles per day, round 4.8m month to push the progress of 144m. Roadway by belt conveyor to transport coal auxi