城郊煤矿3.00Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 城郊 煤矿 3.00 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分为城郊煤矿3.00 Mt/a的新井初步设计,共分10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度、设计生产能力及服务年限;4.井田开拓;5.准备方式-带区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风与安全技术;10.矿井基本技术经济指标。城郊煤矿位于河南省永城市境内,东有京沪铁路,交通便利。井田走向长约11 km,倾向长约6 km,面积约56 km2。主采煤层为二#煤层,平均倾角4,平均厚度5.5 m。井田工业储量为461.99Mt,可采储量445.49Mt,矿井服务年限为66.56a。
2、矿井正常涌水量为57.45 m3/h,最大涌水量为367 m3/h;矿井绝对瓦斯涌出量小于0.5 m3/t,属低瓦斯矿井。根据井田地质条件,矿井采用立井多水平开拓,采用中央并列式通风。一矿一面,采煤方法为综放开采一次采全厚。设计首采区采用带区准备方式,工作面长度250 m,采用综采放顶煤采煤法,矿井年工作日为330 d,每天净提升时间16h。矿井工作制度为“四六制”。大巷采用带式输送机运煤,辅助运输采用矿车运输。矿井通风方式为中央并列式。专题部分题目是浅析综放开采顶煤运移规律及冒放性研究。翻译部分题目是关于长壁开采工作面回采巷道顶板支护设计方法,英文原文题目为:A method for the
3、 design of longwall gateroad roof support。关键词:城郊矿;立井;带区;综放开采AbstractThis design can be divided into three sections: general design, monographic study and translation of an academic paper.The general design is about a 3.50 Mt/a new underground mine design of ChengJiao coal mine. The design includes t
4、en chapters: 1. Mine and mine geological features outlined ; 2. Waida realm and reserves ; 3. Mine system, design capacity and length of service ; 4. Waida develop ; 5. to prepare the way - with the district roadway layout ; 6. mining methods ; 7. underground transport ; 8. mine hoist ; 9. mine vent
5、ilation and security technologies ; 10. mine the basic technical and economic indicators. ChengJiao coal mine lies in YongCheng, Henan province. As Jinghu railway run across the east part of the mining field and Suifu railway run across the east part of the mining field, the traffic is convenient. I
6、ts about 11 km on the strike and 6 km on the dip,with the 56 km2 total horizontal area. The minable coal seam is 2 with an average thickness of 5.5 m and an average dip of 4. The proved reserves of this coal mine are 461.99 Mt and the minable reserves are 445.49 Mt, with a mine life of 66.56 a. The
7、normal mine inflow is 57.45 m3/h and the maximum mine inflow is 367 m3/h. The mine gas emission rate is 0.5 m3/t which belongs to low gas mine. Based on the geological condition of the mine, I bring forward vertical shaft development with two mining levels and the extension of blind inclined shaft,a
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


冲压模具(一)快速成形技术研究.doc

