显德汪矿1.5Mta新井设计.docx
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 显德汪矿 1.5 Mta 设计
- 资源描述:
-
1、摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分共包括10章:1.矿区概述及井田地质特征;2.井田境界和储量;3.矿井工作制度、设计生产能力及服务年限;4.井田开拓;5.准备方式-采区巷道布置;6.采煤方法;7.井下运输;8.矿井提升;9.矿井通风;10.矿井基本技术经济指标。一般部分为邢台显德汪矿1.5Mt/a新井设计。邢台显德汪矿位于河北省邢台市西南部,交通便利。井田走向(南北)长约5km,倾向(东西)长约4km,井田总面积为20km2。主采煤层为2号煤、9号煤,平均倾角为14,煤层平均总厚为7.0m。井田地质条件较为简单。井田工业储量为148Mt,矿井可采储量105Mt。
2、矿井服务年限为53.8a,矿井正常涌水量为140m3/h,最大涌水量为200m3/h。矿井瓦斯涌出量较低,为低瓦斯矿井。井田划分为一水平和一辅助水平,第一水平标高为-50m,双立井开拓,主井装备箕斗,副井装备罐笼。大巷采用机车牵引固定矿车运煤,。矿井通风方式为前期中央并列式,后期两翼对角式通风。矿井年工作日为330d,工作制度为“三八”制。专题部分题目为:煤矿瓦斯事故预防技术研究。翻译部分题目为:Effects of frequency and grouted length on the behavior of guided ultrasonic waves in rock bolts关键词:
3、 新井设计; 井田开拓; 采煤方法;一次采全高ABSTRACTThis design consists of three parts: the general part, the special part and translated part.This design includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.development engi
4、neering of coalfield; 5.The layout of panels; 6. The method used in coal mining; 7. Transportation of the underground; 8.The lifting of the mine; 9. The ventilation and the safety operation of the mine; 10.The basic economic and technical norms.The general part is a new design of xiandewang mine. xi
5、andewang mine lines in Northwest of xingtai in HeBei province. The traffic of road and railway is very convenience to the mine. The geological structure of this area is simple. The Length of the minefield is 5 km ,the width is about 4km,the area is 202.The 2 and 9 is the main coal seam, and its dip
6、angle is 14 degree. The thickness of the mine is about 7.0m in all. The proved reserves of the minefield are 148million tons. The recoverable reserves are 105 million tons. The designed productive capacity is 15 million tons percent year, and the service life of the mine is 53.8 years. The normal fl
7、ow of the mine is 140m3 percent hour and the max flow of the mine is 200m3 percent hour, and the gas of the mine is low gaseous mine.The field has been divided one mining levels. The first level should be located at the lever of -50m, which use raise and dip mining method of vertical shaft developme
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


专题-膏体充填开采原理与技术.doc

