外文翻译-高应力煤巷围岩控制机理研究与实践.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 应力 围岩 控制 机理 研究 实践
- 资源描述:
-
1、英文原文Study on mechanism and practice of surrounding rock control of high stress coal roadwayWANG Wei-jun(卫军)1,YANG Lei(杨磊)1, OUYANG Guang-bin(欧阳广斌)2(1. Department of Energy and Safety, Hunan University of Science and Technology, Xiangtan 411201, China; 2. No.4 Coal Mine, PingdingshanMining Group Comp
2、any, Pingdingshan 467000, China)AbstractThe mechanical principle and surrounding rock deformation feature of high stress coal roadway was analyzed. The condition of stress balance of the kind of the roadway was put forward. The surrounding rock control principle and supporting technique of high stre
3、ss coal roadway were discussed. It was very important to control early period deformation of coal sides. The supporting strength is should increased, so the strength loss of coal sides is decreased. The range of plastic fluid zone is reduced. The above mentioned principle is applied in industrial te
4、st, and the new supporting technique is applied successfully.Key words: high stress; coal roadway; surrounding rock controlIntroductionWith the increasing of mining depth, the surrounding stress of the roadway is heightening and the loosened area is enlarging. Many obvious softening properties of me
5、chanical feature of surrounding rock are taken on. Not only is there subsidence of roof,but also severe deformation of coal sides, intense floor heave, and continued deformation. So it is very difficult to control the surrounding rock of coal roadway. And the expense for maintenance is up to 35 time
6、s of digging for it for footage in many roadways 1. It is always in state of repairing or waiting to repair most of the time, which even the consequence of the roadways being abandoned and dig it again will be lead to. So it is already becomes the urgent problem to be solved of surrounding rock cont
7、rol in deep roadways.1 Deformation characters of the deep coal roadwayAccording to the scene, the deformation characters of the deep coal roadway as follow 2, 3:the speed of deformation is very fast and amount is large, especially sides and floor rock , and sides will heave in 515 days with supporti
8、ng system though it is supported in time after digging;roadways have become maintenance difficult from the time during utilization to excavation, so the number of roadways having to be abandoned after digging just now increases greatly; the deformation of roadway lasts long time, and rheology has be
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


范各庄2.4 Mta新井设计(CAD图纸+说明书).zip

