外文翻译-长壁采煤法回采巷道三向交叉点的三维有限元分析.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 采煤 回采 巷道 交叉点 三维 有限元分析
- 资源描述:
-
1、英文原文Finite element analysis of three-way roadway junctions in longwall miningR.N. Singh, I. Porter, J. HematianFaculty of Engineering, Uniersity of Wollongong, Northfields Avenue, Wollongong, NSW 2522, AustraliaAbstract:This paper presents a three-dimensional finite element analysis of three-way roa
2、dway intersections in longwall mining, and assesses the stable/unstable behaviour of three-way intersections under a range of loading conditions. Loads were applied to the model by means of uniform stresses on the internal free faces. This method of loading the model from the inside helped to reduce
3、 its size and to eliminate the boundary effects. Stress concentrations and displacement results on the mid-height of the pillars, roof and floor strata adjacent to the three-way intersections and cut-throughs were calculated.Based on this study, guidelines for designing the support system for three-
4、way intersections are suggested. The results were validated by a case study of a three-way intersection in an underground coal mine in the southern coal fields of the Sydney Basin. Keywords:underground coal mining; gate roadway; intersections; stability; finite element method1. IntroductionA trend e
5、xists in Australia for installing high productivity longwall faces producing 3.04.0 milliontonne raw coal per annum per face. The main concern for the success of the high-production long wall faces is to achieve high rates of development and to maintain stability of access roadways and their interse
6、ctions during the life span of the face.Intersections are formed when the pillars betweenthe two roadways are intersected by driving a crosscut. Roadway intersections in underground mines areparticularly susceptible to ground control problemsdue to inherently wide roof spans used and the difficulty
7、in installing roof supports promptly inhighly mechanised headings. Stresses induced duringintersection formation may result in high incidenceof roof and rib failures. Despite many investigationsinto the stability of gate roadways intersectionsadverse conditionssuch as high horizontal stress and unst
8、eady state ofabutment pressure from moving longwall faces maycause instability of gate roadway intersections.For example in 1985; major strata control problems inthe main gate of no. 6 longwall panel at WestcliffColliery resulted in roof fall, which stopped coalproduction for a period of 6 weeks. Si
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


厂区管网规划设计CAD图.dwg
滚筒式抛丸清理机的设计(CAD图纸+说明书).zip

