外文翻译-长壁工作面开采中巷道支护与围岩之间相互关系的分析.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 工作面 开采 巷道 支护 围岩 之间 相互关系 分析
- 资源描述:
-
1、外文原文:Analysis for interaction of supports and surrounding rock of gateways in longwall mingingWU Yong-ping(Xian University of Science and Technology, Xi an710054, China)Abstract:Gateway supporting in long-wall mining has been a problem that restricts the mine production and safety, the paper sets up
2、 an interaction model between support and surrounding rock (rock mass structure) and probes the elementary theory about ground pressure behaviors of gateway. Based on the analysis of supporting theories, some new viewpoints about gateways supporting and ground pressure controlling are put forward.Ke
3、ywords: support surrounding rock, interaction, gateway, long-wall miningIntroductionFor the gateways extracted in solid coal (rock) or having wide coal pillar in one side, the most unfavorable situation is to regard surrounding rock mass as loose medium, but even in this condition rock mass structur
4、e like arch can still form during a certain period, and its calculating theories is well-known.When the gateways of long-wall face are influenced by face advancing, in acute interval of working influenc zone (at the intersection region of face with gateways), because cover strata moves severely, the
5、 simple arch structure will be not formed in lower strata, but a 4-demensions rock structure which extends deeper and relatives with time- coal is formed. The structure can be described as formula (1) and has following characteristics:F (x, y, z, t) = 0 (1)(1) When gateways are ones driving along ad
6、jacent goaf or reserved for next face, the catch-borders of the structure will be solid coal one side of face, waste falling and compacted behind face and adjacent goaf, so its extending range will be very large.(2) The rock structure moves forward in the way of “forming -destabilizing forming again
7、 as the face advancing.(3) At the intersection of face with gateways, rock structure is regarded a flat cowl of its long axis along face line and short one along axial line of gateways.1. Analysis of internal stress of the rock structureSupposing t= t0 in formula (1) and the rock structure is shown
8、as Fig. 1.Getting any element from the model shown in Fig. 2, the distribution of its internal stress are shown as Fig. 1, and the equilibrium differential equation of the element can be obtained from Fig. 2.Fig.1 model of rock structure in gatewaywhere, Nx, Ny, Sxy, Syx are film internal stress; Mx
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


某地下车库人防通风平面图CAD图纸.dwg
CA6140型车床主传动系统设计【CAD图纸+说明书】.zip

