外文翻译-综放开采技术及合理架型的发展趋势.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 放开 技术 合理 发展趋势
- 资源描述:
-
1、翻译部分英文原文The developing trend of fully mechanized mining and caving technology and the rational supportsAbstract:This paper summarized the outstanding achievements of Yankuang on the areas of long wall top coal caving technology (LTCC). Analysis and research have been done through site tests on the c
2、haracteristics of dynamic movement of supports at coal face, the caving breakage, power transmission regulations and the existing problems in four leg low level shield supports. The paper recommends a new type support, which can further improve the relationship between supports and wall rock, and al
3、so prospects the future development of LTCC technology.Keywords: LTCC;The relationship between the supports of LTCC and wall rock;The prospects of new typeLTCC is a mining method with high efficiency and productivity, which is most suitable for thick coal seams with appropriate conditions. It is wid
4、ely adopted due to its high productivity, high efficiency, low cost, safety and reliability. Its technical advantage has been transformed to cost advantage.Since Yankuang Group introduced the LTCC through audacious practice, its coal face output was raised from 1 Mt to 6.4 Mt and its mining efficien
5、cy has been increased by 7.2 times compared with slicing mining. Achievements of Yankuang took a lead to the overall progress of caving technology and equipment and made a great contribution to the development of the coal industry of China.However, through mining practices of many years, we found th
6、at there are still disadvantages in the four leg low level shield supports, which restricts at a certain extent the further development and improvement of LTCC technology. This paper explores the developing trend of LTCC technology, especially the development of rational supports.The general situati
7、on of the LTCC technology in Yanzhou GroupCovering Yanzhou Coal Field and Jining Coal Field, Yanzhou mining area includes six extraordinary large scaled modern minesNantun, Xinglong-zhuang, Baodian, Dongtan, Jier, Jisan and two mines of thin seams. The main seams are No.3 seam with average thickness
8、 of 8.5 m, Upper No.3 seam with average thickness of 5.25 m and Lower No.3 seam with average thickness of 4.1 m.The technical development of Yanzhou Mining area experienced two stages-conventional mining (before1979), mechanized mining (1979 1991) and entered into the stage of LTCC from 1992. The ou
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

