外文翻译-采空区瓦斯移动规律与瓦斯抽放孔位置关系.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 采空区 瓦斯 移动 规律 抽放孔 位置 关系
- 资源描述:
-
1、翻译部分英文原文Methane moving law with long gas extraction holes in goafYong ZHANG, Xibin ZHANG*,Chunyuan LI, Chuanan LIU, Zufa WANGFaculty of Resources and Safety Engineering, China University of Ming & Technology, Beijing 100083, ChinaAbstractIn order to grasp the methane moving law in goaf and provide a
2、 theoretical data for gas extraction holes, the height of caving and fractured zones in the stope has been calculated according to the experiential formula and gas movement law has been observed by field and laboratory experiment. It also gives gas moving characteristics with different position of e
3、xtraction holes. And it has the best gas extraction result when the final holes are arranged around 30m above the coal seam and 10-20m away from the tailentry in horizontal direction. Besides, the height of final holes should be adjusted to the overburden strata structure. When final holes are near
4、the tailentry, their height should be controlled in the upper of regular caving zone; when they are close to the center of face, their height should be controlled at the bottom of fracture zones. 2011 Published by Elsevier Ltd. Selection and/or peer-review under responsibility of China Academy of Sa
5、fety Science and Technology, China University of Mining and Technology(Beijing), McGill University and University of Wollongong.Keywords: gas in goaf; gas movement;gas extraction holes; position of extraction holes; expe riment1 IntroductionThe roof strata above the goaf will fracture and form the c
6、aving, fracture and bending zones in the vertical direction after mining the coal seam. And there are lots of fractures and cracks in caving and fracture zones, the permeability of the stratum are also high. According to the “O” circle theory of fracture distribution in the stope 1, the gas of goaf
7、will move and gather up along those fractures and cracks. Then it is easier to cause the gas exceeding the limit, which need to take measures to reduce gas content. In order to solve this problem and get the best extraction effect, the layout of holes should be adjusted to the rock structure changes
8、 according to the arch structure characteristics of roof stratas movement 2.* Corresponding author. Tel.: +86-15210567715.E-mail address: zhangxibin627246.1877-7058 2011 Published by Elsevier Ltd.doi:10.1016/j.proeng.2011.11.21793558Yong ZHANG et al. / Procedia Engineering 26 (2011) 357 365Gas in go
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

