外文翻译-案例解析—短壁开采技术回收煤柱.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 案例 解析 开采 技术 回收
- 资源描述:
-
1、 第 27 页翻译部分英文原文Exploitation of developed coal mine pillars by shortwall mininga case exampleA. Kushwaha, G. BanerjeeCentral Mining Research Institute, Barwa Road, Dhanbad 826001, Jharkhand, IndiaAbstract: The shortwall mining technique is similar to longwall mining but with shorter face lengths, ran
2、ging between 40 and 90m, with the aim of controlling the caving nature of the overlying upper strata, the load on support and the overall operation of the supports applied at the face. Field observations and three-dimensional numerical modelling studies have been conducted for the longwall panel ext
3、raction of the Passang seam at Balrampur Mine of SECL to understand the caving behavior of the overlying upper strata. A large area of the Passang seam adjacent to the longwall panels has already been developed via bord and pillar workings. In this paper, numerical modelling studies have been conduc
4、ted to assess the cavability of the overlying strata of the Passang seam in the mine over developed bord and pillar workings along with the support requirement at the face and in the advance gallery. The caving nature of the overlying rocks characterized by the main fall is predicted for varying fac
5、e lengths, strata condition and depths of cover. The support resistance required at the face, the load in the advance gallery and its optimal obliquity were estimated for faster exploitation of the developed pillars in the Balrampur mine by shortwall mining. Keywords: Exploitation; Shortwall mining;
6、 Geo-mining; Obliquity; Block contours; Main fall; Advance gallery1. IntroductionIn India, underground coal production is mostly dependent upon the conventional bord and pillar (room and pillar) method of mining, although the overall output per man shift (OMS) through this method is generally not mo
7、re than 1 ton in any of the mines 1. Large areas in all the subsidiaries of Coal India Limited and even in Singarani Coal Companies Limited (India) have been developed via bord and pillar workings. There is a need to search for a new method of mining for the faster exploitation of these developed pi
8、llars to improve productivity.In this paper, the authors have conducted different numerical modelling studies using Fast Lagrangian Analysis of Continua (FLAC) software, to assess the cavability of the overlying strata of the Passang seam in Balrampur Mine of SECL (India) over developed bord and pil
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


NMRV蜗杆减速机CAD图纸.dwg
N-17800-2凝汽器结构图.zip

