外文翻译-采矿工业中实用的神经网络应用.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 采矿 工业 实用 神经网络 应用
- 资源描述:
-
1、翻译部分英文原文Practical Neural Network Applications in the Mining IndustryL. Miller-Tait, R. PakalnisDepartment of Mining and Mineral Process Engineering,University of British Columbia,Vancouver, B.C., CanadaABSTRACTThe mining industry relies heavily upon empirical analysis for design and prediction. Neur
2、al networks arecomputer programs that use parallel processing, similar to the human brain, to analyze data for trends andcorrelation. Two practical neural network applications in the mining industry would be rockburst predictionand stope dilution estimates. This paper summarizes neural network data
3、analysis results for a 1995Goldcorp/Canmet study on rockbursting and a 1986 UBC/Canmet study on open stope dilution at theRuttan Mine.1 INTRODUCTIONMany aspects of mine design are based upon empirical data. Neural Networks analyze data and predictions based on previous results. Neural networks havea
4、dvantages over conventional empirical designapproaches.These advantages include: Neural networks can easily use multiple inputs to analyze data. By using multiple hidden layers and nodes neural networks investigate the combined influence of inputs. Neural networks can be easily retrained as new data
5、 becomes available making them a more dynamicand flexible empirical estimation approach. Neural network software is inexpensive and easy to use. Neural networks have demonstrated a more accurate empirical estimate over conventional methods.The advantages of using neural networks are illustrated in a
6、 rockburst prediction example and an open stope dilution example.2 ROCKBURST PREDICTIONThe first example of a potential situation where neural networks could be useful in the mining industry isthe prediction of rockbursts through physical inputs. To quote directly from the Ontario Ministry ofLabor“.
7、we do not have the ability to predict when and where rockbursts will occur, and the experts in the fieldagree that we are not close to make such predictions” 1. Between 1984 and 1993 eight undergroundminers were killed in Ontario due to rockbursts. This accounted for approximately 10% of underground
8、 fatalities during this period. If neuralnetworks were to have success in predicting where rockburstsoccur, additional ground support, remote equipment, and/or design modifications could reduce or possibly eliminate fatalities due to rockburst. As safety is the primary responsibility of mining engin
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

