外文翻译-水压控制爆破后进行水力致裂增加煤岩体裂隙.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 水压 控制 爆破 进行 水力 增加 煤岩体 裂隙
- 资源描述:
-
1、翻 译 部 分英文原文Hydraulic fracturing after water pressure control blasting forincreased fracturingBingxiang Huang,Changyou Liu,Junhui Fu,Hui GuanSchool of Mines,China University of Mining and Technology,South 3rd Ring Road,Xuzhou,Jiangsu 221116,ChinaAbstract:Traditional hydraulic fracturing techniques ge
2、nerally form main hydraulic cracks and airfoil branch fissures,but main hydraulic cracks are relatively few in number.Hydraulic fracturing after water pressure control blasting can transform the structure of coal and rock mass.Experiments prove that it is an effective method for increasing the numbe
3、r and range of hydraulic cracks,as well as for improving the permeability of coal seams.The technical principle is as follows.First,a hole is drilled in the coal seam and is injected with a gel explosive(a mining water-proof explosive).Then,water is injected into the hole to seal it,at low enough pr
4、essure to prevent cracks from forming.Third,water pressure blasting is done by detonating the explosive.The water shock waves and bubble pulsations produced by the explosion cause a high strain rate in the rock wall surrounding the hole.When the stress imposed on the rock wall surrounding the hole e
5、xceeds its dynamic critical fracture strength,the surrounding rock breaks and numerous circumferential and radial fractures propagate outward.Lastly,water injection processes,such as general injection,pulse injection,and/or cyclic injection,are carried out to promote hydraulic fracturing.Depending o
6、n the fissure water pressure,detonation fissures continue to expand and additional hydraulic fractures with a wider range are formed.Under the effect of detonation pressure,joints and fissures in the coal mass open and propagate,leading to reduced adhesive forces on structural surfaces and thereby e
7、nhancing coal cutting.Therefore,this method improves the permeability of the coal seam,effectively weakens the strength of the coal and rock mass,and reduces the surrounding rock stress of the weakened area,effectively solving the problem of having a small number of big cracks.It is a useful technic
8、al approach for improving top coal caving,preventing rock burst,preventing coal and gas outbursts,and raising the gas extraction efficiency in colliery.Key words:Hydraulic fracturing;Water pressure blasting;Crack propagation1 IntroductionLow-permeability coal-seam gas extraction;hard,thick coal-seam
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


车床法兰盘零件的机械加工工艺规程及工艺装备设计(钻轴向孔4-Φ9).zip

