外文翻译-在煤矿井筒中关于水垢切割机的研究和开发.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 煤矿 井筒 关于 水垢 切割机 研究 开发
- 资源描述:
-
1、翻译部分JOURNAL OF COAL SCIENCE &ENGINEERING(CHINA) ISSN 1006-9097pp 7882 Vol.10 No.1 June 2004Research and development on cutting scale machine in the coalmine shaftREN Bao-cai (任保才)(The Mechanical Engineering Department, Jiaozuo Institute of Technology, Jiaozuo 454000, China)Abstract The deposit scale
2、 in the coal mine shaft usually causes serious accidents, such as making rope broken, cage seized or dropped. To solve this kind of problems, the research of the cutting scale mechanism was made, and a new type of removal scale equipment was made with using imported hard alloy material. The cutting
3、experiment and actual cutting show that it can adapt to abominable condition in the shaft, such as narrow space, wet and excessive shaft crevice water and so on, and can work safely and reliably, and has high cutting scale efficiency. It can also cut out the deposit scale in the circular section of
4、shaft.Key words deposit scale in shaft wall, cutting scale, cutting mechanism, cutting scale machineIn the service shaft of Tongye Coal Mine of Anyang Mining Bureau, the shaft crevice water is excessive, and in water there is a large of lime stone deposit, which leads to large scale on the shaft wal
5、l through long time, which is 300 mm in thickness. The initial design diameter of the shaft is D=3.2 m,the clearance between the cage and the shaft wall is 200mm, but now the projecting part of cage has been embedded in the scale about 100 mm, which is shown in Fig.1. Once in a winter, the shaft cre
6、vice water frozen and seized the elevating cage, this made the winding rope broken suddenly, and led the cage to drop into the bottom of shaft, which caused large economic losses. The scale in the shaft wall is always one of the hard problems puzzling this coal mine. The study about the scale is mor
7、e than 100 years, and great progress have been made 14,which is presented mainly in two different aspects.The first is to control and slow the scale to form,and study the principle how the scale is formed and the dynamic model that the scale is separated out and sunk58 and so on. Using chemical meth
8、od,clear out the scale by pretreatment and intenerate to water, such as adding antifouling composition and so on. The second is to clear out the scale existing on the shaft wall, mostly using chemical, physical9,10, abrasive jets methods and so on. But these methods have not been found to be used in
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


汽车千斤顶三维模型SW.zip

