1、摘 要本设计为同煤集团东周窑煤矿4#煤层,年产量为150万吨。该煤层的储量为20752.04万吨。区内煤层赋存比较稳定,断层少,煤层倾角平均为5,煤层厚度平均为5m。该煤层范围内整体地质条件相对来说简单。按照实际掌握的地质资料情况进行盘区巷道布置和准备方式的初步设计,4号煤层第一盘区首采面的开拓方式。本次设计采取综合机械化放顶煤回采工艺,采煤方法采用走向长壁采煤法,用全部跨落法处理采空区,并且对盘区巷道、机械设备、运输和通风等每一个生产系统的设施进行选型计算,完成了对盘区的最初设计。矿井灾害防治是针对瓦斯、火灾、水害、粉尘等对对开采过程中的影响。对其矿山救护队的重点培养,以备不时之需。矿井已经
2、全部采取综合机械化生产,采取尖端的技术装备和参阅已经达到高产能高效率的现代化矿井的成功的经,实行一矿一井一面,高产能高效率的安全矿井。以达到最大的经济效益与社会财富。关键词:走向长壁;放顶煤;综合机械化;高产能高效率;安全生产 ABSTRACTThis design is 4# coal seam of Tong Zhou coal mine in Tong Coal Group, with an annual output of 1 million 500 thousand tons. The reserves of the coal seam are 207 million 520 tho
3、usand and 400 tons. The occurrence of coal seams in the area is relatively stable, with few faults, the average coal seam inclination is 5 degrees, and the average thickness of coal seam is 5m. The overall geological condition of the coal seam is relatively simple. According to the actual geological
4、 data, a preliminary plan for the layout and preparation of the roadway is carried out, and the first mining face of the No. 4 coal seam is first developed. This design adopts a comprehensive mechanized caving coal mining technology, the mining method adopts the long wall mining method, the goaf is
5、treated with all the cross fall method, and the selection and calculation of the facilities of each production system, such as the roadway, mechanical equipment, transportation and ventilation, have been selected, and the initial plan of the disk area is completed.Mine disaster prevention is aimed a
6、t the impact of gas, fire, water and dust on the mining process. The key points of the mine rescue teams should be trained for emergency needs. The mine has all adopted comprehensive mechanized production, adopted the advanced technical equipment and read the successful experience of the modern mine
7、 with high productivity and high efficiency, and carried out a mine with a mine, one side, high productivity and high efficiency. In order to achieve the greatest economic benefit and social wealth.Key words:Heading for long wall; top coal caving;comprehensive mechanization;high productivity and hig