外文翻译-澳大利亚充填开采的土力学因素.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 澳大利亚 充填 开采 土力学 因素
- 资源描述:
-
1、英文原文Geotechnical considerations in mine backfilling in AustraliaN. Sivakugan a,*,R.M. Rankine b, K.J. Rankine a, K.S. Rankine aa School of Engineering, James Cook University, Townsville 4811, Australiab Cannington Mine, BHP Billiton, P.O. Box 5874, Townsville 4810, AustraliaAbstract :Mine backfillin
2、g can play a significant role in the overall operation of a mine operation. In the Australian mining industry, where safety is a prime consideration, hydraulic systems are the most common backfills deployed.Many accidents reported at hydraulic fill mines worldwide have mainly been attributed to a la
3、ck of understanding of their behaviour and barricade bricks.This paper describes the findings from an extensive laboratory test programme carried out in Australia on more than 20 different hydraulic fills and several barricade bricks. A limited description of paste backfills is also provided, and th
4、e usefulness of numerical modelling as an investigative tool is highlighted. Keywords: Hydraulic fills; Mining; Backfills; Paste fills; Geotechnical1IntroductionIn the mining industry, when underground ore bodies are extracted, very large voids are created, which must be backfilled. The backfilling
5、strategies deployed often make use of the waste rock or tailings that are considered by-products of the mining operation. This is an effective means of tailing disposal because it negates the need for constructing large tailing dams at the surface. The backfilling of underground voids also improves
6、local and regional stability, enabling safer and more efficient mining of the surrounding areas. The need for backfilling is a major issue in Australia, where 10 million cubic metres of underground voids are generated annually as a result of mining 1. There are two basic types of backfilling strateg
7、ies. The first, uncemented backfilling, does not make use of binding agents such as cement, and their characteristics can be studied using soil mechanics theories. A typical example of uncemented backfilling is the use of hydraulic fills that are placed in the form of slurry into the underground voi
8、ds. The second category, cemented backfilling, makes use of a small percentage of binder such as Portland cement or a blend of Portland cement with another pozzolan such as fly ash, gypsum or blast furnace slag. The purpose of this paper is to analyse the findings from an extensive laboratory test p
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


阿司匹林片剂洁净区平面布局图CAD图纸.dwg
40×40矩形垫片零件的冲压复合模具设计【冲孔落料复合模】.zip

