外文翻译-底板煤层的瓦斯抽放控制.doc
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 底板 煤层 瓦斯 控制
- 资源描述:
-
1、翻译部分(英文原文)Control of gas emissions in underground coal minesKlaus Noack DMT-Gesellschaft fur Forschung und Prufung mbH,Institut fur Bewetterung,Klimatisierung und Staubbekampfung,Franz-Fischer-Weg 61,Essen,GermanyReceived 2 August 2003accepted 24 February2004Abstract: A high level of knowledge is no
2、w available in the extremely relevant field of underground gas emissions from coal mines.However,there are still tasks seeking improved solutions,such as prediction of gas emissions,choice of the most suitable panel design,extension of predrainage systems,further optimization of postdrainage systems
3、,options for the control of gas emissions during retreat mining operations,and prevention of gas outbursts.Research results on these most important topics are presented and critically evaluated.Methods to predict gas emissions for disturbed and undisturbed longwall faces are presented.Prediction of
4、the worked seam gas emission and the gas emission from headings are also mentioned but not examined in detail.The ventilation requirements are derived from the prediction results and in combination with gas drainage the best distribution of available air currents is planned.The drainage of the gas f
5、rom the worked coal seam,also referred to as predrainage,can be performed without application of suction only by over or underworking the seam.But in cases where this simple method is not applicable or not effective enough,inseam-boreholes are needed to which suction is applied for a relatively long
6、 time.The reason for this is the low permeability of deep coal seams in Europe.The main influences on the efficiency of the different degasing methods are explained.Conventional gas drainage employing cross measure boreholes is still capable of improvement,in terms of drilling and equipment as well
7、as the geometrical borehole parameters and the operation of the overall system.Improved control of gas emissions at the return end of retreating faces can be achieved by installation of gas drainage systems based on drainage roadways or with long and large diameter boreholes.The back-return method c
8、an be operated safely only with great difficulty,if at all. Another method is lean-gas drainage from the goaf.The gas outburst situation in Germany is characterized by events predominantly in the form ofnonclassical outbursts categorized a sudden liberation of significant quantities of gas .Recent r
展开阅读全文
图海文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。


座椅连接板成形工艺及模具设计.doc

