1、摘 要瓯江水电站即紧水滩电站在瓯江上游干流梯级开发的第一级水电站,工程以发电为主,兼顾航运、放木及防洪等综合利用要求。瓯江流域处浙东南沿海山区,属于年调节水库。本次设计的水库死水位为264m,正常蓄水位为285m。根据历史洪水资料设计洪水(P=0.1%),水库的设计洪水位291m。校核洪水位(P=0.01%)为293m。水电站装机容量为20万kW,四台机组单机5.0万kW。水轮机型为为HL-220-LJ-330坝后地面式厂房,开关站布置在左岸。主厂房宽20m,长74.6m进场公路布置在右岸。副厂房是为保证水电站正常运行需要,设置在主厂房上游侧。主要布置各种机电辅助设备、房间、生产间和必要生活设
2、施房间。电站建成后主要担任华东电网调峰并供电丽水、温州将使丽、温两地区通过220千伏输电线路联系,形成浙南电力系统。此外,电站的建设,将带动当地工农业发展,为当地居民创造就业条件,改善当地社会经济,促进当地以及周围地区的发展。AbstractOujiang plant (JinSshuiTan plant)is the first step hydropower station in upper reaches of the Oujiang River. The main purpose of the project is to generate electricity, but also c
3、onsidered the woods of the shipping and protect floods. Oujiang River basin located in the southeast area which is near the say in Zheijang Province, and the plant is a year adjust reservoirThis design determined the dead water level is 264m, the normal water level is 284m. According to the historic
4、al flood date (P=0.1%), the designed flood level is 291m, the proofread level is 293m (P=0.01%).According to the characteristics of geology and topography, gravity dam was chosen. The total electric capacity is 200,000kW,and four generates whose capacity is 50,000kW was installed. The type of the tu
5、rbine is HL-220-LJ-330. The power house is situated behind dam.The width of the main power house is 20 m,the length is 74.6m. All kinds of auxiliary equipment and other kinds of rooms assemble in deputy house.When the plant is constructed, it regulates the electric network of the southeast of China,
6、 and it also supple electricity to Lishui and Wenzhou. It will connect the Lishui and Wenzhou electricity nets. At last a electricity net will be formed. Additionally, the construction of the hydropower station will spur on the development of the industry and agricultures in the area. It will also s
7、pur on the job improvement of the economic condition .目录摘 要1Abstract2第一章 基本设计资料61.1 地理位置61.2 水文与气候61.3 地形与地质81.3.1 水库区工程地质81.3.2 坝址地质81.4 天然建筑材料91.4.1 土料:91.4.2 砂石料:91.5 既给设计控制数据9第二章 枢纽布置及挡水、泄水建筑物102.1枢纽布置102.2 挡水及泄水建筑物102.2.1坝高确定102.2.2挡水建筑物砼重力坝112.2.3 泄水建筑物混凝土重力坝溢流坝142.3 坝内构造192.3.1坝顶结构192.3.2纵缝:1