1、摘 要丰宁抽水蓄能电站位于河北省承德市丰宁满洲自治县,电站以正在建设中的丰宁水电站水库为下水库,上水库位于永利村滦河左岸灰窑子沟顶端。枢纽总体建筑物由上水库、输水系统、下水库、地下厂房系统及地面出线场和开关站等部分组成。电站总装机 175万千瓦,共六台机,每台29万千瓦。水库枢纽工程包括: 钢筋混凝土面板堆石坝、放空隧洞、 进 / 出水口、环库公路 。本电站引水系统较长,尾水系统较短,经比较选择引水和尾水系统均采用一管三机的布置方式。经计算, 引水系统需设置调压井。水道系统由引水系统和尾水系统两部分组成。引水系统建筑物包括 : 上水库进 / 出水口、引水隧洞、引水调压井、高压管道、岔管和高压支
2、管。 尾水系统建筑物包括 : 尾水支洞、尾水事故闸门室、尾水隧洞和下水库进 / 出水口等。上水库进 / 出水口采用岸边侧式进 / 出水口 , 布置于左坝肩上游库岸 , 前沿设有拦污栅和防涡梁 , 其后布置有事故闸门井及启闭机房。电站采用中尾部开发方式 , 地下厂房洞室群布置在粗粒花岗岩层内。AbstractAbundant rather pumps water gathers can the power plant be located the Hebei Province Chende abundant rather Manchu Autonomous County, the power p
3、lant take is constructing the abundant rather hydroelectric power station reservoir as under reservoir, on the reservoir will be located forever benefits the village Luanhe River left bank ash kiln sub-ditch peak. The key position overall building by on reservoir, the water - carrige system, under t
4、he reservoir, the underground workshop system and the ground leaves parts and so on field of lines and switching house is composed. The power plant always installs equipment 1,750,000 kilowatts, altogether six machine, each 290,000 kilowatts.The reservoir key project includes: The reinforced concret
5、e kneading board rock-fill dam, blows off the tunnel, enters/the water outlet, the link storehouse road.This power plant pilot system is long, the tailwater system is short, uses three machines after the comparison choice pilot and the tailwater system the arrangement way. After the computation, the
6、 pilot system must establish the surge tank. The canal system is composed by the pilot system and the tailwater system two parts. The pilot system building includes: On the reservoir enters/the water outlet, the derivation tunnel, the pilot surge tank, the high-pressured pipeline, the branch pipe an
7、d the high-pressured branch. The tailwater system building includes: A tailwater hole, the tailwater accident gate chamber, the tailwater tunnel and under the reservoir enters/the water outlet and so on.On the reservoir enters/the water outlet to use the shore side type to enter/the water outlet, ar