欢迎来到图海文库! | 帮助中心 分享价值,成长自我!
图海文库
全部分类
  • 机械模具>
  • 机电控制>
  • 工艺夹具>
  • 车辆工程>
  • 化工环保>
  • 土木建筑>
  • 采矿通风>
  • CAD图纸>
  • 三维模型>
  • 数控编程>
  • 文档资料>
  • ImageVerifierCode 换一换
    首页 图海文库 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译-煤炭特殊开采.doc

    • 资源ID:21303       资源大小:63KB        全文页数:10页
    • 资源格式: DOC        下载积分:10金币
    微信登录下载
    验证码下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    二维码
    微信扫一扫登录
    下载资源需要10金币
    邮箱地址:
    验证码: 获取验证码
    温馨提示:
    支付成功后,系统会自动生成账号(用户名为邮箱地址,密码是验证码),方便下次登录下载和查询订单;
    支付方式: 支付宝    微信支付   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    外文翻译-煤炭特殊开采.doc

    1、翻译部分英语原文COAL MINING UNDER SPECIAL CONDITIONSSECTION1 LONGWALL MINING TECHNIQUESFOR MINIMIZING SURFACE STRUCTURAL DAMAGESLongwall mining is a relatively new mining method in the United States. Early trials in the eastern and central coal fields were not successful, mainly because, among others, the f

    2、ace supports did not have sufficient capacity. It was not until in the late 1960s , when the highcapacity self-advancing powered supports became available,that longwall mining was successfully reintroduced. Since then the number of mines employing the longwall method has been steadily increasing. It

    3、 has reached approximately 7.5 in 1981.One of the major concerns for longwall mining is the extent of surface subsidence and its induced surface structural damages. The experiences have been that room and pillar mining with low recovery ,e.g. no pillar mining can be implemented such that no measurab

    4、le surface subsidence occurs during the period of underground mining, although subsidence may occur long after (say 4050 years)mining. In contrast, the general concept about longwall mining is that since there is a complete extraction of coal in a longwall panel, there will be much large surface sub

    5、sidence and thus structural damages. This is to some extent justifiable because past research has demonstrated that surface subsidence due to longwall mining occurred even when the seam depth was close to 1000 ft. and that minor ctackings could occur in a residential house depending on the type and

    6、location of the residential house within the panel. In other words under longwall mining there could be some damage to some surface structures such as houses. But it can be protected such that the damages are so minor that except minor crackings, the houses are practically the same before and after

    7、mining.Therefore in dealing with the protective measures for surface structural damages due to underground longwall mining it must be recognized that mearly all surface structures can be completely protected if the cost is not the subject. But this is not necessary . Instead, there should be a compr

    8、omise between the cost to be expended and the degree of damages the structures will be sustained. In anticipation of the development of longwall mining, the authors have been studying the subsidence problems that have occurred in major coal producing countries in the world. In this paper various min

    9、ing techniques that have been successfully employed for reducing surface structural damages are reviewed and presented. Protective Measures for Surface Structures It is well known that underground mining will induce movements and deformation of the overburden strata and surface. As a result, surface

    10、 structures within the movement basin will be subjected to deformation. In general it is uncommon to adopt measures that will completely eliminate structural deformations because its extremely costly and difficult to accomplish . The technical methods that are normally employed can be divided into t

    11、wo categories : Methods for protecting the structural elements of the structures and protective mining methods for reducing surface movements. The basic principle is that a small amount of deformation is allowed to occur. Within this limit, the structure maintains its normal functions as well as it

    12、did before mining. The objective of any methods employed for protection of the structural elements is that the structures can tolerate the deformation induced by longwall mining. The repair cost for those protected structures will be much less than those unprotected ones. The normal practice is to p

    13、redict the potential amount of surface deformation, followed by evaluating the intensity of damage based on the allowable amount of deformation for the structures. Finally, the proper protective measures are adopted. The protective mining methods should be such that they reduce the amount of deforma

    14、tion occurred on the surface and the structures. These include partial and backfill mining and any other mining methods that achieve high percentage of recovery by making use of the deformational characteristics of surface movements. Under normal conditions, mining under a group of surface structure

    15、s should consider the protective mining methods and the corresponding methods for protecting the structural elements of the surface structures. Experiences in foreign countries have demonstrated that such considerations are economically reasonable and technically feasible. As the characteristics of

    16、surface movements become better known, the preferential mining techniques for surface structural protection changes from strip mining or room and pillar mining to full face longwall mining; and later from longwall backfilling to longwall caving method. In many cases, the longwall caving with proper designs and procedures, coupled with the protective measures for structural elements has achieved satisfactory results.


    注意事项

    本文(外文翻译-煤炭特殊开采.doc)为本站会员主动上传,图海文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知图海文库(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    网站客服QQ:2356858848

      客服联系电话:18503783681

    copyright@ 2008-2022 thwenku.com网站版权所有

    ICP备案:豫ICP备2022023751号-1