欢迎来到图海文库! | 帮助中心 分享价值,成长自我!
图海文库
全部分类
  • 机械模具>
  • 机电控制>
  • 工艺夹具>
  • 车辆工程>
  • 化工环保>
  • 土木建筑>
  • 采矿通风>
  • CAD图纸>
  • 三维模型>
  • 数控编程>
  • 文档资料>
  • ImageVerifierCode 换一换
    首页 图海文库 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译-煤层钻孔减压.doc

    • 资源ID:21221       资源大小:58.50KB        全文页数:10页
    • 资源格式: DOC        下载积分:10金币
    微信登录下载
    验证码下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    二维码
    微信扫一扫登录
    下载资源需要10金币
    邮箱地址:
    验证码: 获取验证码
    温馨提示:
    支付成功后,系统会自动生成账号(用户名为邮箱地址,密码是验证码),方便下次登录下载和查询订单;
    支付方式: 支付宝    微信支付   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    外文翻译-煤层钻孔减压.doc

    1、 英文原文 ROTARY DRILLING HOLES IN COALBEDS FOR DEGASIFICATION By Joseph Cervik, H, HI Fields12 and G, N, AulABSTRACT Coal is a soft and brittle material. Drilling rates in the P ittsbugh coalbed using a drag bit exceed 3 ft/min at 2,500-pound thrust. However,maintaining the bit on a horizontal trajecto

    2、ry or parallel to bedding planes to attain lengths of 1,000 feet is difficult. This Bureau of Mines report presents a drill string configuration that can be guided through the coalbed. The angle of the borehole is measured periodically and by proper combinations of bit thrust and rotational speed (r

    3、/min), bit trajectory can be lifted or dropped to keep the bit in the coalbed. An example of a hole drilled to 2,126 feet is presented to show levels of thrust and rotational speed used to lift or drop the bit, the seemingly unexplainable events that occur, and the strategy used during drilling. Thr

    4、ust levels during drilling range from 600 to 2,500 pounds. Hydraulic motors powered by a 30-hp, 440-volt motorprovide ample power for drilling horizontal holes 2,000 feet long.INTRODUCTION Experience has shmn that methane flow rates from horizontal holes drilled into coalbeds are directly proportion

    5、al to length. For holes drilled from underground locations in a coal mine in the Pittsburgh coalbed (Fairview, W. Va., area), a characteristic flow rate is 25,000 ft3/d per 100 feet of hole. However, in areas of the coalbed remote from mining, such as in shafts located 1 mile or more from an undergr

    6、ound mine, initial flow rates are much greater and approach 65,000 ft3/d per 100 feet of horizontal hole. The lower flow rate is the result of partial degasification of the coalbed along the periphery of the mine. Maintaining a bit on a horizontal trajectory or inclined to follow the dip of a coalbe

    7、d is difficult. The natural tendency of the bit during horizontal drilling is to arc downward because of gravity. Changes in hardness of the coalbed or hard inclusions such as pyrite balls may deflect the bit in an unpredictable manner. Starting in 1957, the B rit is hconducted experimental drilling

    8、 studies to develop tools and equipment for drilling horizontal holes in coal to depths of 450 f eet. Procedures were developed for inducing the bit to rise or fall; no infzrmation was published on bitthrust and rotational speed. A state - of - the - art study on horizontal drilling in 1970 conclude

    9、d there are no reliable published data on horsepower, thrust, rotational speed, bit configuration, and the effects of these factors on hole trajectory. In the Pitsburgh coalbed, horizontal degasification holes have been drilled ranging in length from 500 to 850 feet . Hole trajectory was controlled

    10、by close - fitting stabilizers (packed hole) that ranged from 2 to10 feetlong. Torque, drilling speed, thrust, and rotational speed were not measured. At a demonstration in a strip pit, a horizontal hole was drilled to a depth of 1,034 feet. Drilling parameTers and a drill - string configuration wer

    11、e developed experimentally to control hole trajectory. Holes in excess of 1,000 feet expose alarge are a of the Pittsburgh coalbed to degasification and, therefore, fewer holes are required along the mines periphery to reduce significantly methane flow in to the mine. addition, four orfive horizonta

    12、l holes (1,000 feet long) produce about 1 million ft3 / d of methane, which can be piped to the surface through an underground system of pipelines. Reduction in methane flow in to mine openings improves safety, results in a savings in ventilation costs, and improves the potential for increased coal

    13、production. The objectives of this Bureau of Mines report are to describe the demonstrated methods of maintaining a bit on a predetermined trajectory and to provide data on drilling parameters and equipment. This report provides guidelines and reviews concepts for (those who are contemplating) a hor

    14、i-zontal drilling program. Drilling procedures and parameters have been developed for the Pittsburgh coalbed. Although procedures and parameters may requires light modifications in other coalbeds, the principles of horizontal drilling are unchanged.ACKNOWLEDGMENTS The cooperation of Eastern Associat

    15、ed Coal Corp, Pittsburgh, Pa, is greatly appreciated. The authors thank William Laird, vice president - - research and development, for his cooperation in conducting some of the work described in this report and for his continued interest and support. We acknowledge the work of Fenix and Scisson, In

    16、c . Tulsa, Okla., on horizontal drilling, which was sponsored by the Bureau of Mines (contract No. H0111355). underlined numbers i n parentheses refer to items in the list of references at the end of this report.DRILLING HARDWARE Coal is a soft and brittle material in comparison to a sandstone and, therefore, presents no special problems in drilling. However, hard inclusions such as pyrite concr


    注意事项

    本文(外文翻译-煤层钻孔减压.doc)为本站会员主动上传,图海文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知图海文库(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    网站客服QQ:2356858848

      客服联系电话:18503783681

    copyright@ 2008-2022 thwenku.com网站版权所有

    ICP备案:豫ICP备2022023751号-1