欢迎来到图海文库! | 帮助中心 分享价值,成长自我!
图海文库
全部分类
  • 机械模具>
  • 机电控制>
  • 工艺夹具>
  • 车辆工程>
  • 化工环保>
  • 土木建筑>
  • 采矿通风>
  • CAD图纸>
  • 三维模型>
  • 数控编程>
  • 文档资料>
  • ImageVerifierCode 换一换
    首页 图海文库 > 资源分类 > DOC文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译-综采工作面顶板突水的分析与控制.doc

    • 资源ID:21192       资源大小:434.50KB        全文页数:15页
    • 资源格式: DOC        下载积分:10金币
    微信登录下载
    验证码下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    二维码
    微信扫一扫登录
    下载资源需要10金币
    邮箱地址:
    验证码: 获取验证码
    温馨提示:
    支付成功后,系统会自动生成账号(用户名为邮箱地址,密码是验证码),方便下次登录下载和查询订单;
    支付方式: 支付宝    微信支付   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    外文翻译-综采工作面顶板突水的分析与控制.doc

    1、翻译部分英文原文Analysis and control on anomaly water inrush in roof of fully-mechanized mining fieldPeng Linjun 1,2,3, Yang Xiaojie 1,3, Sun Xiaoming 1,31 School of Mechanics and Civil Engineering, China University of Mining & Technology, Beijing 100083,China 2 Academician Pioneering Park, Dalian Universit

    2、y, Dalian 116622, China 3 State Key Laboratory of Geomechanics and Deep Underground Engineering, China University of Mining &Technology, Beijing 100083, ChinaAbstract: Caving of mine roofs from water inrush due to anomalous pressure is one of the major disasters and accidents that can occur in mines

    3、 during production. Roof water inrush can trigger a wide range of roof collapse, causing major accidents from breaking roof supports while caving. These failures flood wells and do a great deal of damage to mines and endanger mine safety. Our objective is to analyze the anomalies of water inrush cru

    4、shing the support at the #6301 working face in the Jisan Coal Mine of the Yanzhou Mining Group. Through information of water inrush to the roof, damage caused by tectonic movements, information on the damage caused by roof collapse and the theory about the distribution of pressure in mine abutments,

    5、 we advice adjusting the length of the working face and the position of open-off cut relatively to the rich water area. In the case of anomalous roof pressure we should develop a state equation to estimate preventive measures with “transferring rock beam” theory. Simultaneously,we improve the capaci

    6、ty of drainage equipment and ensured adequate water retention at the storehouse.These are all major technologies to ensure the control and prevention against accidents caused by anomalous water inrush in roofs, thus ensuring safety in the production process of a coal mine. Keywords: Roof;Water inrus

    7、h pressure;Anomaly;Analysis;Control;abstract;Caving1. IntroductionBoth domestic and foreign investigators pay considerable attention to coal mine pressure anomalies and obtained various results. However, because of the complexity of anomalous pressure, as well as the mutability of surrounding rock c

    8、onditions caused by caving, a number of difficulties are encountered in building an exact and systematic mathematical mechanical model. Furthermore, because geological conditions differ considerably in various parts of a coalfield and the reality is very complex, we must therefore adopt a number of

    9、different measures and methods to predict and monitor geological conditions, given that many methods have their own limitations. The process of calculation for the support of the surrounding rock summarizes this mechanism, thus perfecting the method of forecasting and monitoring, forming a feasible

    10、and efficient system for safety in production, ensuring security and efficiency at coal mining faces. Coal mine pressure anomalies, showing up in fully-mechanized caving fields, as dynamic phenomena interfering with safe production in coal mines, refer to anomalous rock pressure occurring under spec

    11、ial conditions. When the mechanical balance is broken in a coal (rock) body around a coal mining field, it usually shows up as damage to the support system, as a crushed or sinking roof level or as severe spalling, before the occurrence of risky leaks and ultimately coal and gas outbursts. When rock

    12、 pressure appears as anomalies, it often results in damage to equipment, significant loss of coal resources and forming simultaneously significant security risks, which in coal mines may lead to devastating consequences. In recent years, a large number of mine pressure anomalies occurred in fully-me

    13、chanized caving mines in Chinas Yanzhou and Xuzhou mining areas, causing considerable economic losses to coal companies. Therefore, further systematic study of the structure and movement of the overlying rock in fully-mechanized caving mines, may reveal the behavior of mine pressure anomalies, disco

    14、ver the conditions under which these anomalies occur, find methods to forecast and prevent them, in order to achieve safety and efficient production. 2. Coal seam conditions and structure of overlying rockThe Jisan Coal Mine is located in a suburb of Jining city, where the mining area is about 110 k

    15、m2. Geological reserves of 880 million tons, industrial reserves of 800 million tons, and recoverable reserves of 530 million tons have been confirmed. The #3 coal layer has 400 million tons of coal, accounting for 75.5% of recoverable reserves. These coal strata are part of the Permian Shanxi Forma

    16、tion and the Carboniferous Taiyuan, with eight layers of locally accessible coal and an average thickness of 10.44m. Themajor recoverable coal is found in the 3up, 3down layer with an average thickness of 6.21 m. The geological condition of the mining area is a simple middle structure. The main northesouth normal fault is apparently regular, with most of the east rising and the west falling. Also, there are faults showing the development of eastewest with the eas


    注意事项

    本文(外文翻译-综采工作面顶板突水的分析与控制.doc)为本站会员主动上传,图海文库仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知图海文库(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    网站客服QQ:2356858848

      客服联系电话:18503783681

    copyright@ 2008-2022 thwenku.com网站版权所有

    ICP备案:豫ICP备2022023751号-1